QUIZ: IBS Score

QUIZ: IBS Score

University

10 Qs

quiz-placeholder

Similar activities

AK B5 PEMBINAAAN (SET 3@ IBS)

AK B5 PEMBINAAAN (SET 3@ IBS)

University

15 Qs

W14 Pop Quiz No. 1

W14 Pop Quiz No. 1

University

8 Qs

2025 Transportation Subsystems Vocabulary

2025 Transportation Subsystems Vocabulary

7th Grade - University

8 Qs

IBS 3 ( Irritable bowel syndrome 3 )

IBS 3 ( Irritable bowel syndrome 3 )

3rd Grade - Professional Development

9 Qs

Software Engineering (UML)

Software Engineering (UML)

University

15 Qs

Kuiz Teras Nadi Keunggulan KPM

Kuiz Teras Nadi Keunggulan KPM

University

10 Qs

III_B_SE_Quiz_3

III_B_SE_Quiz_3

University

10 Qs

IBS SCORE - Introduction

IBS SCORE - Introduction

University

5 Qs

QUIZ: IBS Score

QUIZ: IBS Score

Assessment

Quiz

Other

University

Easy

Created by

SUSHILAWATI BINTI ISMAIL SUSHILAWATI BINTI ISMAIL

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Choose the type of projects that are not applicable to be scored by referring to CIS18:2018

Housing

Shopping mall

Bridges

Museums

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is the attribute of the IBS Scoring System?

Volume of the building

Repetition of components

Type of construction material

Project cost

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

IBS Score distributed to the following:


50% Structural system + 30% Wall system + 20% Slab system


50% Structural system + 30% Wall system + 20% Other simplified solutions


50% Structural system + 20% Wall system + 30% Other simplified solutions


50% Structural system + 20% Wall system + 30% Slab system

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

For IBS Score calculation for multi-storey building, it should start with the top level, following to the lower level until the ground.

True

False

5.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

By referring TABLE 2 in CIS18:2018, determine the IBS Factor, Fs for the following structural components for the ground floor of a building.

Precast concrete beam

Column with timber formwork

All slab pre-stress plank

6.

FILL IN THE BLANK QUESTION

2 mins • 1 pt

By referring TABLE 2 in CIS18:2018, determine the IBS Factor, Fs for the following structural components for the first floor of a building.

Load bearing wall using system formwork

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

By referring TABLE 3 in CIS18:2018, determine the IBS Factor, Fs for the following structural components for the roof of a building.

Prefab roof truss

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?