27202 #8 Apply roof Framing

27202 #8 Apply roof Framing

9th Grade

•

26 Qs

quiz-placeholder

Similar activities

Accounting II - Chapter 13

Accounting II - Chapter 13

9th - 12th Grade

•

24 Qs

Accounting Chapter 4

Accounting Chapter 4

9th - 12th Grade

•

25 Qs

Patents

Patents

9th - 12th Grade

•

24 Qs

Architectural Terms

Architectural Terms

9th - 12th Grade

•

22 Qs

Introduction to EMS Systems

Introduction to EMS Systems

9th - 12th Grade

•

24 Qs

Economics: Chapter 10 Review

Economics: Chapter 10 Review

KG - University

•

25 Qs

TYC Final Review #2

TYC Final Review #2

8th - 11th Grade

•

21 Qs

Cooking Methods

Cooking Methods

9th Grade

•

22 Qs

27202 #8 Apply roof Framing

27202 #8 Apply roof Framing

Assessment

Quiz

•

Specialty

•

9th Grade

•

Practice Problem

•

Hard

Created by

Christopher Foy

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a topic covered under the objectives of Session Eight?

Roof projections

Flashing

Ventilation

Gutter installation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the performance task for Session Eight in the roofing applications module?

Demonstrate the use of metal roofing tools

Properly cut and install the ridge cap using composition shingles

Design a new type of roofing material

Inspect and repair damaged roof tiles

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional component is mentioned to be installed in the performance task besides the ridge cap?

A solar panel

A chimney

A cricket or saddle

A skylight

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in installing vent-stack flashing according to the diagram?

Apply sealant around the base of the stack

Apply roofing up to where stack projects and cut and fit shingles around stack

Install the underlayment over the stack

Secure the stack with nails

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the next step in installing vent-stack flashing after placing the flange over the stack according to the image provided?

Secure with nails

Apply a sealant around the edges

Press down into roofing cement

Cover with additional underlayment

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of molding the flange to the vent-stack in roofing applications?

To increase the aesthetic appeal of the roof

To ensure a snug fit

To make the installation process faster

To reduce the cost of materials

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be applied to the top of the flange during the installation of a soil stack?

Paint

Oil

Cement

Water

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?