2.1.5 01 Cycle Time Quiz

2.1.5 01 Cycle Time Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Parts of the Sewing Machine

Parts of the Sewing Machine

KG - University

18 Qs

Accounting 1 - Ch. 6 Review

Accounting 1 - Ch. 6 Review

KG - University

19 Qs

Punctuality Questions

Punctuality Questions

12th Grade

10 Qs

Unit 10: Mathematics For Engineering - Initial Assessment

Unit 10: Mathematics For Engineering - Initial Assessment

12th Grade

12 Qs

Sewing Safety Review

Sewing Safety Review

9th - 12th Grade

16 Qs

Build your future section reviews

Build your future section reviews

9th - 12th Grade

18 Qs

Module 1- Welding Safety 29101-15

Module 1- Welding Safety 29101-15

9th - 12th Grade

20 Qs

ServSafe Chapter 12 Review

ServSafe Chapter 12 Review

12th Grade

20 Qs

2.1.5 01 Cycle Time Quiz

2.1.5 01 Cycle Time Quiz

Assessment

Quiz

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Cycle Time in the context of Standard Work Analysis?

The time a machine runs un-aided without manual intervention

The time it takes to do one repetition of any particular task

The operator with the longest Processing Time

The processing time of the machine working on a part

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is Machine Time included in the calculation of Cycle Time?

If the process is labour intensive

If the process is machine intensive

Always included

Never included

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is Cycle Time measured in Value Stream Mapping?

Minutes per unit

Hours per unit

Days per unit

Seconds per unit

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the starting point for measuring Cycle Time?

The time a machine runs un-aided without manual intervention

The complete time it takes to produce a single unit

The starting point of one product's processing in a specified machine or operation

The time loading, unloading, flipping/turning parts

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Manual Cycle Time in the context of Cycle Time categorization?

The processing time of the machine working on a part

The time loading, unloading, flipping/turning parts, adding components to parts

The time a machine runs un-aided without manual intervention

The complete time it takes to produce a single unit

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Auto Cycle Time in the context of Cycle Time categorization?

The time a machine runs un-aided without manual intervention

The complete time it takes to produce a single unit

The processing time of the machine working on a part

The time loading, unloading, flipping/turning parts, adding components to parts

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Overall Cycle Time used to measure?

The complete time it takes to produce a single unit

The time loading, unloading, flipping/turning parts, adding components to parts

The time a machine runs un-aided without manual intervention

The processing time of the machine working on a part

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?