Search Header Logo

4.1.3 Quiz on KANBAN Signals

Authored by Nurhana Juraimi

Specialty

12th Grade

4.1.3 Quiz on KANBAN Signals
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a signal in the KANBAN system?

To empty containers

To schedule work

To send some more (a transfer batch)

To produce some more (a process batch)

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are empty containers acting as signals considered a potential hazard?

They signal to fill it

They signal to produce more

They signal to stop production

They signal to increase stock

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main characteristic of a Single Card KANBAN system?

Only pull system for delivery

Only push system for production

Push system for production and pull system for delivery

Pull system for production and push system for delivery

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Input / Output Control KANBAN system, how is the supply chain treated?

As separate units for each operation

As a random sequence of operations

As a linear chain of operations

As one unit rather than a series of linked operations

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a Kanban Accumulator in the KANBAN system?

Allow Kanban signals to accumulate until production batch size is reached

Prevent Kanban signals from accumulating

Reduce the number of Kanban signals

Increase the buffer stock

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main difference between a Single Card System and a Dual Card System in KANBAN?

Separation of replenishment and produce signals

Combination of replenishment and produce signals

Use of different types of cards

Use of the same card for all signals

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the scheduling system in a Dual Card System?

To calculate the buffer stock

To authorize the production batch

To determine which job is next

To schedule the delivery

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?