kanban Quiz on Combine Pull System

kanban Quiz on Combine Pull System

12th Grade

8 Qs

quiz-placeholder

Similar activities

Airbag System Components quiz

Airbag System Components quiz

12th Grade - University

10 Qs

InnRoads Quiz

InnRoads Quiz

10th - 12th Grade

10 Qs

Drone Technology - Regulations 1

Drone Technology - Regulations 1

8th - 12th Grade

10 Qs

Psychology - Ch. 12, Part 3

Psychology - Ch. 12, Part 3

9th - 12th Grade

7 Qs

7L4 Nervous System: Sensation

7L4 Nervous System: Sensation

10th - 12th Grade

13 Qs

AS 6.02 Livestock Identification and Financial Review

AS 6.02 Livestock Identification and Financial Review

9th - 12th Grade

12 Qs

Manufacturing Pathways Quiz

Manufacturing Pathways Quiz

7th - 12th Grade

12 Qs

AAT Level 3 Costs and Revenues

AAT Level 3 Costs and Revenues

KG - University

10 Qs

kanban Quiz on Combine Pull System

kanban Quiz on Combine Pull System

Assessment

Interactive Video

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main concept demonstrated in the video tutorial?

Kanban System

Batch Production System

Combine Pull System

Just-In-Time Inventory System

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of part is produced by the color machine?

Red Part

Green Part

Blue Part

Yellow Part

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drives the restocking process in the system?

Automated Sensors

Auditory Signals

Visual Signals

Manual Inventory Checks

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What action is triggered when the Assembly of the unit leaves a blank space?

Restocking green parts

Replacing the box maker

Producing another blue cylinder

Ordering more cardboard

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the signal for the Press Upstream to restock a part?

Audible alarm

Color change in the machine

New shipment arrival

Empty space on the shelf

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of leaving empty spaces in the production process?

To confuse the workers

To indicate the need for restocking

To save space in the warehouse

To reduce production speed

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens when the box maker pulls the last box from the pile?

Increase the price of the product

Switch to a different product

Stop production

Order more cardboard

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of signals drive the restocking process in the system?

Visual Signals

Auditory Signals

Manual Inventory Checks

Automated Sensors