kanban Lean Production Quiz

kanban Lean Production Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

pull system kanban Lean Manufacturing Quiz

pull system kanban Lean Manufacturing Quiz

12th Grade

16 Qs

Miter Saw Safety

Miter Saw Safety

9th - 12th Grade

20 Qs

Company departments

Company departments

10th - 12th Grade

15 Qs

Pemeriksaan Transmisi Otomatis

Pemeriksaan Transmisi Otomatis

11th - 12th Grade

18 Qs

Business - Quality

Business - Quality

6th - 12th Grade

13 Qs

Unit 2 Macro Review

Unit 2 Macro Review

12th Grade

15 Qs

Motorized Miter Saw Safety

Motorized Miter Saw Safety

6th - 12th Grade

12 Qs

Miter Saw Safety Review

Miter Saw Safety Review

6th - 12th Grade

12 Qs

kanban Lean Production Quiz

kanban Lean Production Quiz

Assessment

Interactive Video

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main concept associated with Lean Production?

Order

Stock

Pull

Push

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the incorrect understanding about Push and Pull in production?

Pull equals make to stock

Push equals make to order

Pull equals make to order

Push equals make to stock

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct understanding about producing goods for a warehouse in relation to Pull production?

It results in higher costs

It leads to increased lead time

It is possible

It is not possible

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the incorrect understanding about information flow in Push and Pull systems?

Push equals information at shop floor level

Pull equals information at shop floor level

Push equals central logistics

Pull equals central logistics

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the incorrect understanding about central logistics in relation to Push and Pull?

Central logistics equals Push

Pull equals information at shop floor level

Push equals information at shop floor level

Central logistics equals Pull

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct understanding about the relationship between electronic kanban and Pull production?

Electronic kanban is only for Push systems

Electronic kanban increases lead time

Electronic kanban helps in setting WIP limits

Electronic kanban is not used in Pull systems

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of a Push production system?

To increase stock levels

To have no limit on WIP

To improve quality

To reduce lead time

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?