1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a characteristic of a Push System?

Instructions come from a central planning area

Receiving workstation does not accept any defective parts

Processes are based on customer demand

Quick Changeovers : Set-Up Kaizen

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a characteristic of a Pull System?

What to build and in what order come from a central planning area

Everyone’s work is scheduled and triggered by required start dates

Receiving workstation does not accept any defective parts

Cellular Manufacturing : Flow Kaizen

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main identifier of pull systems?

Having KANBAN methods in production cycle

Receiving workstation does not accept any defective parts

Low Variability :Variability Reduction Kaizen (6 Sigma tools)

Instructions come from a central planning area

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the concept behind a Pull System?

Receiving workstation does not accept any defective parts

Quick Changeovers : Set-Up Kaizen

Instructions come from a central planning area

Processes are based on customer demand

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a prerequisite of a Kanban 'Pull' System?

What to build and in what order come from a central planning area

Receiving workstation does not accept any defective parts

Stable, Flat Demand : JIT Principles

Quick Changeovers : Set-Up Kaizen

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the aim of having a visual aid like Kanban in a Pull System?

To have a lot of paperwork

To build excessive stock levels of raw materials

To reduce lead times and associated costs

To increase paperwork and computer transactions

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What dictates the production requirements for upstream operations in a Pull System?

The Quick Changeovers : Set-Up Kaizen

The anticipated demand

The central planning area

The status of downstream operations

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Specialty