E & C Set No - 1

E & C Set No - 1

University

24 Qs

quiz-placeholder

Similar activities

BEEE Pre-test Assessment

BEEE Pre-test Assessment

University

20 Qs

Principal of marketing chapter 2

Principal of marketing chapter 2

University

20 Qs

QUIZ Pemahaman Audit dan Profesi Auditor

QUIZ Pemahaman Audit dan Profesi Auditor

University

20 Qs

Module 7: Digital Storage Quiz

Module 7: Digital Storage Quiz

University

19 Qs

Artificial Potential Field Method & Roadmaps

Artificial Potential Field Method & Roadmaps

University

20 Qs

Ultimate office trivia quiz

Ultimate office trivia quiz

KG - Professional Development

25 Qs

Consumer Behavior

Consumer Behavior

University

20 Qs

EMBEDDED SYSTEM DESIGN

EMBEDDED SYSTEM DESIGN

University

20 Qs

E & C Set No - 1

E & C Set No - 1

Assessment

Quiz

Other

University

Easy

Created by

Sahil Suryawanshi

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The shortest possible time in which an activity can be achieved under ideal circumstances is known as _____

Pessimistic time estimate

Optimistic time estimate

Expected time estimate

The most likely time estimate

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To make out an estimate for a work the following data are necessary-Drawing, Specification and ____

materials

rates

labors

transportation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is required for preliminary studies of various aspects of a work or project.

Supplementary Estimate

Plinth Area Estimate

Revised Estimate

Abstract Estimate

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is prepared on the basis of plinth area of building, the rate being is prepared on the basis of plinth area of building, the rate deducted from the cost of similar building having similar specification, heights and construction, in the locality.

Cube Rate Estimate

Supplementary Estimate

Maintenance Estimate

Plinth Area Estimate

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______is the amount provided in the estimate and bill of quantities for is the amount provided in the estimate and bill of some specialized work to be done by a specialized firm; whose details are not known at the time of preparing an estimate.

Prime cost

Provisional sum

Capital cost

Building cost index

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method approx. total length of walls is found in running meter and this total length multiplied by the rate per running meter of wall gives a fairly accurate cost.

Annual repair

Item rate estimate

Approximate quantity method estimate

Cubical content estimate

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____ estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

Supplementary and revised estimate

Maintenance estimate

Item rate estimate

Revised estimate

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?