E & C Set No - 1

E & C Set No - 1

University

24 Qs

quiz-placeholder

Similar activities

LOAD FLOW

LOAD FLOW

University

25 Qs

EA025 PAL

EA025 PAL

University

20 Qs

VIVA-CIVIL ENGINEERING, BUILDING RULES AND REGULATIONS

VIVA-CIVIL ENGINEERING, BUILDING RULES AND REGULATIONS

University

20 Qs

Quiz - PAS 8 & PFRS 8

Quiz - PAS 8 & PFRS 8

University

25 Qs

Machine Learning Pipeline and Models Quiz

Machine Learning Pipeline and Models Quiz

University

20 Qs

Elasticities

Elasticities

University

20 Qs

Chapter 12 Review: Bertino and Bertino (2016)

Chapter 12 Review: Bertino and Bertino (2016)

11th Grade - University

25 Qs

FIN 340 Practice 7 - Chap. 14

FIN 340 Practice 7 - Chap. 14

University

25 Qs

E & C Set No - 1

E & C Set No - 1

Assessment

Quiz

Other

University

Easy

Created by

Sahil Suryawanshi

Used 6+ times

FREE Resource

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The shortest possible time in which an activity can be achieved under ideal circumstances is known as _____

Pessimistic time estimate

Optimistic time estimate

Expected time estimate

The most likely time estimate

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To make out an estimate for a work the following data are necessary-Drawing, Specification and ____

materials

rates

labors

transportation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is required for preliminary studies of various aspects of a work or project.

Supplementary Estimate

Plinth Area Estimate

Revised Estimate

Abstract Estimate

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is prepared on the basis of plinth area of building, the rate being is prepared on the basis of plinth area of building, the rate deducted from the cost of similar building having similar specification, heights and construction, in the locality.

Cube Rate Estimate

Supplementary Estimate

Maintenance Estimate

Plinth Area Estimate

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______is the amount provided in the estimate and bill of quantities for is the amount provided in the estimate and bill of some specialized work to be done by a specialized firm; whose details are not known at the time of preparing an estimate.

Prime cost

Provisional sum

Capital cost

Building cost index

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this method approx. total length of walls is found in running meter and this total length multiplied by the rate per running meter of wall gives a fairly accurate cost.

Annual repair

Item rate estimate

Approximate quantity method estimate

Cubical content estimate

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____ estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

Supplementary and revised estimate

Maintenance estimate

Item rate estimate

Revised estimate

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?