Understanding Change Control vs. Deviation

Understanding Change Control vs. Deviation

25 Qs

quiz-placeholder

Similar activities

Camp K12 Quiz

Camp K12 Quiz

1st - 3rd Grade

20 Qs

Fantastic beasts The crimes of Grindelwald

Fantastic beasts The crimes of Grindelwald

1st Grade - University

20 Qs

BI Trivia

BI Trivia

9th - 12th Grade

20 Qs

Pecados Capitales

Pecados Capitales

1st - 4th Grade

21 Qs

What is Entrepreneurship?

What is Entrepreneurship?

12th Grade

20 Qs

Staircase

Staircase

University

20 Qs

ESTRUCTURALISMO

ESTRUCTURALISMO

University

20 Qs

Fnaf

Fnaf

1st - 8th Grade

20 Qs

Understanding Change Control vs. Deviation

Understanding Change Control vs. Deviation

Assessment

Quiz

Other

Practice Problem

Easy

Created by

ahmed hasham

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

The formulation of a product is being adjusted to improve stability. Which documentation process should be followed?

Change Control

Deviation

2.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

During routine production, an operator accidentally uses the wrong cleaning agent. What should be documented?

Change Control

Deviation

3.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A new piece of equipment is being installed in the manufacturing line. Which process applies?

Change Control

Deviation

4.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A deviation from the standard operating procedure (SOP) occurs due to a power outage. What should be filed?

Change Control

Deviation

5.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

The location of a critical manufacturing step is being moved to a different facility. What process should be followed?

Change Control

Deviation

6.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A batch of product does not meet its specified quality criteria during in-process testing. What process should be followed?

Change Control

Deviation

7.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A new supplier has been selected for a critical raw material. What process should be initiated?

Change Control

Deviation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?