Understanding Change Control vs. Deviation

Understanding Change Control vs. Deviation

25 Qs

quiz-placeholder

Similar activities

GEN ANA 1 LAB ACTIVITY 2024

GEN ANA 1 LAB ACTIVITY 2024

University - Professional Development

20 Qs

COM7B6 - DNA

COM7B6 - DNA

7th Grade

20 Qs

Research methodology

Research methodology

University

20 Qs

Group B Back and Spine Quiz

Group B Back and Spine Quiz

University

20 Qs

5th , Blaisian  Children's Day Quiz

5th , Blaisian Children's Day Quiz

5th Grade

20 Qs

CH. 2 Econ

CH. 2 Econ

10th - 12th Grade

20 Qs

Electronics Resistor

Electronics Resistor

9th - 12th Grade

22 Qs

Cougar Cafe Trivia 8.27.2021

Cougar Cafe Trivia 8.27.2021

9th - 12th Grade

20 Qs

Understanding Change Control vs. Deviation

Understanding Change Control vs. Deviation

Assessment

Quiz

Other

Practice Problem

Easy

Created by

ahmed hasham

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

The formulation of a product is being adjusted to improve stability. Which documentation process should be followed?

Change Control

Deviation

2.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

During routine production, an operator accidentally uses the wrong cleaning agent. What should be documented?

Change Control

Deviation

3.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A new piece of equipment is being installed in the manufacturing line. Which process applies?

Change Control

Deviation

4.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A deviation from the standard operating procedure (SOP) occurs due to a power outage. What should be filed?

Change Control

Deviation

5.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

The location of a critical manufacturing step is being moved to a different facility. What process should be followed?

Change Control

Deviation

6.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A batch of product does not meet its specified quality criteria during in-process testing. What process should be followed?

Change Control

Deviation

7.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

A new supplier has been selected for a critical raw material. What process should be initiated?

Change Control

Deviation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?