9.1 SMED Quiz

9.1 SMED Quiz

12th Grade

11 Qs

quiz-placeholder

Similar activities

Basic Auto Review

Basic Auto Review

12th Grade

10 Qs

MA Ch 8 Medical Records

MA Ch 8 Medical Records

12th Grade

16 Qs

PSL1CH7Vocab Hygiene & Cleanliness

PSL1CH7Vocab Hygiene & Cleanliness

9th - 12th Grade

10 Qs

Mechatronics 101

Mechatronics 101

9th - 12th Grade

14 Qs

The Engineering Design Process (FoT Unit 2, 12 Steps)

The Engineering Design Process (FoT Unit 2, 12 Steps)

9th - 12th Grade

10 Qs

ASE Engine Performance

ASE Engine Performance

11th - 12th Grade

10 Qs

Chapter 1 Introduction to Health Care (6)

Chapter 1 Introduction to Health Care (6)

12th Grade

14 Qs

Tire, Wheel, and Wheel Bearing ASE Questions - CH73

Tire, Wheel, and Wheel Bearing ASE Questions - CH73

9th - 12th Grade

15 Qs

9.1 SMED Quiz

9.1 SMED Quiz

Assessment

Quiz

Specialty

12th Grade

Practice Problem

Hard

Created by

Nurhana Juraimi

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does SMED stand for?

Single-Minute Exchange of Die

Single-Minute Equipment Deployment

Speedy Manufacturing Efficiency Design

Sequential Machine Efficiency Development

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of SMED?

Increase setup times

Decrease manufacturing uptime

Improve teamwork

Reduce time for setup operations

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of CHANGEOVER TIME in SMED?

Elapsed time between finishing the last part of the previous batch and finishing the first one of the next batch at full production speed

Time between finishing the first part of the previous batch and starting the next batch

Time taken to clean the equipment after setup

Time required to modify the equipment for quicker stops

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are INTERNAL TASKS in SMED related to?

Tasks that are performed after the setup is complete

Tasks that involve external equipment

Tasks that can be performed while the process is running

Tasks that must be performed when the process is stopped

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are EXTERNAL TASKS in SMED related to?

Tasks that are performed after the setup is complete

Tasks that can be performed while the process is running

Tasks that involve internal adjustments

Tasks that must be performed when the process is stopped

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using SMED in manufacturing?

To increase setup times

To decrease manufacturing uptime

To improve efficiency by reducing setup time

To slow down production processes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of reducing changeover time in SMED?

It helps in increasing downtime

It improves overall equipment effectiveness

It has no impact on production efficiency

It only affects setup operations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?