Gas testing

Gas testing

12th Grade

12 Qs

quiz-placeholder

Similar activities

Growth cycle and skin diagram

Growth cycle and skin diagram

12th Grade

14 Qs

Food Defense การปกป้องอาหารให้ปลอดภัยจากการปนเปื้อนโดยเจตนา

Food Defense การปกป้องอาหารให้ปลอดภัยจากการปนเปื้อนโดยเจตนา

1st Grade - University

10 Qs

Bab 9 : Kimia Industri Ting4

Bab 9 : Kimia Industri Ting4

1st - 12th Grade

10 Qs

Boating Safety Equipment

Boating Safety Equipment

11th - 12th Grade

15 Qs

Quis Klasifikasi Zat

Quis Klasifikasi Zat

12th Grade

10 Qs

Pre-Test Physical Science

Pre-Test Physical Science

11th - 12th Grade

15 Qs

Trees

Trees

9th - 12th Grade

10 Qs

APARATO RESPIRATORIO

APARATO RESPIRATORIO

1st - 12th Grade

14 Qs

Gas testing

Gas testing

Assessment

Quiz

Science

12th Grade

Practice Problem

Medium

Created by

Shawn Murdoch

Used 22+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Regulation 22 specify regarding gas tightness testing?

Requirements for gas tightness testing after work has been done on installation pipework.

Requirements for gas tightness testing before work has been done on installation pipework.

Requirements for gas tightness testing only in emergency situations.

Requirements for gas tightness testing only for new installations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to ACOP 22(1), what should be done to all joints affected by the portion of work done?

They should be visually inspected to ensure they have been correctly made.

They should be painted immediately.

They should be left uninspected.

They should be replaced.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What could happen if paint or corrosion protection is applied to a joint before it has been tested, according to Guidance 22(1)?

It could provide a temporary seal and falsify the test result.

It could enhance the test result.

It could have no effect on the test result.

It could permanently seal the joint.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be done immediately after purging gas through installation pipework?

The pipework must be sealed off at every outlet with the appropriate fitting.

The gas supply must be turned off.

The pipework must be painted.

The gas must be tested for purity.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to Regulation 22(2), what should be done if purging has been carried out through a loosened connection?

The connection should be retested for gastightness after it has been retightened.

The connection should be left as it is.

The connection should be replaced immediately.

The connection should be painted.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required when gas is not being supplied to any premises in which installation pipework is installed?

No person shall permit gas to pass into the installation pipework unless purging, testing, and other specified work is carried out.

The gas supply must be turned off.

The pipework must be painted.

The gas must be tested for purity.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to the supply or installation pipework if the gas supply is provided some time before installation work is done?

It should be properly capped so that no third party can interfere with it.

It should be painted.

It should be left as it is.

It should be tested for purity.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?