Gas testing

Gas testing

12th Grade

12 Qs

quiz-placeholder

Similar activities

Residential Wiring Chap.7 Quiz

Residential Wiring Chap.7 Quiz

12th Grade

10 Qs

Life Sci: Properties of Water

Life Sci: Properties of Water

9th - 12th Grade

15 Qs

Waves and Technology

Waves and Technology

8th Grade - University

15 Qs

Types of Graphs & Graphing

Types of Graphs & Graphing

9th - 12th Grade

14 Qs

Lab Safety Quiz

Lab Safety Quiz

6th - 12th Grade

12 Qs

Allergic Reaction

Allergic Reaction

12th Grade

10 Qs

Water Review

Water Review

9th - 12th Grade

16 Qs

Electrical Design

Electrical Design

12th Grade

11 Qs

Gas testing

Gas testing

Assessment

Quiz

Science

12th Grade

Medium

Created by

Shawn Murdoch

Used 19+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Regulation 22 specify regarding gas tightness testing?

Requirements for gas tightness testing after work has been done on installation pipework.

Requirements for gas tightness testing before work has been done on installation pipework.

Requirements for gas tightness testing only in emergency situations.

Requirements for gas tightness testing only for new installations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to ACOP 22(1), what should be done to all joints affected by the portion of work done?

They should be visually inspected to ensure they have been correctly made.

They should be painted immediately.

They should be left uninspected.

They should be replaced.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What could happen if paint or corrosion protection is applied to a joint before it has been tested, according to Guidance 22(1)?

It could provide a temporary seal and falsify the test result.

It could enhance the test result.

It could have no effect on the test result.

It could permanently seal the joint.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be done immediately after purging gas through installation pipework?

The pipework must be sealed off at every outlet with the appropriate fitting.

The gas supply must be turned off.

The pipework must be painted.

The gas must be tested for purity.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to Regulation 22(2), what should be done if purging has been carried out through a loosened connection?

The connection should be retested for gastightness after it has been retightened.

The connection should be left as it is.

The connection should be replaced immediately.

The connection should be painted.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required when gas is not being supplied to any premises in which installation pipework is installed?

No person shall permit gas to pass into the installation pipework unless purging, testing, and other specified work is carried out.

The gas supply must be turned off.

The pipework must be painted.

The gas must be tested for purity.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to the supply or installation pipework if the gas supply is provided some time before installation work is done?

It should be properly capped so that no third party can interfere with it.

It should be painted.

It should be left as it is.

It should be tested for purity.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?