1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
In PETI, apart from public used, installation at wet floor requires RCCB at
10 mA.
30 mA.
50 mA.
100 mA.
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
“Sub distribution board rating is 125A but final load must not exceed 63A”. In PETI, this is consider to be…
Portable Equipment supply.
Welding Supply.
Temporary Installation.
Fixed Installation.
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Based on PETI standard, portable equipment used in hazardous area must be …
Rated at low voltage or extra low voltage.
Purged continuously after used.
Calibrated and tested properly.
Ex equipment only.
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the common validity of PCF?
3 months.
6 months.
9 months.
12 months
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the minimum size of earthing conductor acceptable for Portable Generator?
6 mm square.
10 mm square.
16 mm square.
25mm square.
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
This equipment must be earthed. This equipment is considered…equipment.
Class I.
Class II.
Class III.
Class IV.
7.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the maximum size of RCD for Class I equipment?.
10 mA.
30 mA
60 mA
100 mA
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?