Final Quiz E03 EII

Final Quiz E03 EII

Professional Development

40 Qs

quiz-placeholder

Similar activities

SPL.01 (12.2024)

SPL.01 (12.2024)

Professional Development

40 Qs

Module 2 - Semi Precision Measuring Instrument and Hand tools

Module 2 - Semi Precision Measuring Instrument and Hand tools

Professional Development

38 Qs

Test Training House 1st Season Rudy Patch

Test Training House 1st Season Rudy Patch

Professional Development

39 Qs

Certified Information Systems Security Professional (CISSP)

Certified Information Systems Security Professional (CISSP)

Professional Development

40 Qs

Employability Skills 2nd Semester Module 3 4 5

Employability Skills 2nd Semester Module 3 4 5

Professional Development

41 Qs

LV2.2Q imi revision

LV2.2Q imi revision

Professional Development

44 Qs

GCMP 2022 : QUIZ 1

GCMP 2022 : QUIZ 1

Professional Development

45 Qs

GROAP 14 - 2022

GROAP 14 - 2022

Professional Development

35 Qs

Final Quiz E03 EII

Final Quiz E03 EII

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Easy

Created by

AZAHAR TAIB

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In PETI, apart from public used, installation at wet floor requires RCCB at

10 mA.
30 mA.
50 mA.
100 mA.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

“Sub distribution board rating is 125A but final load must not exceed 63A”. In PETI, this is consider to be…

Portable Equipment supply.
Welding Supply.
Temporary Installation.
Fixed Installation.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Based on PETI standard, portable equipment used in hazardous area must be …

Rated at low voltage or extra low voltage.
Purged continuously after used.
Calibrated and tested properly.
Ex equipment only.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the common validity of PCF?

3 months.
6 months.
9 months.
12 months

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of earthing conductor acceptable for Portable Generator?

6 mm square.
10 mm square.
16 mm square.
25mm square.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This equipment must be earthed. This equipment is considered…equipment.

Class I.
Class II.
Class III.
Class IV.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum size of RCD for Class I equipment?.

10 mA.
30 mA
60 mA
100 mA

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development