GMJ 6035 electrical quiz NEW 6

GMJ 6035 electrical quiz NEW 6

Professional Development

20 Qs

quiz-placeholder

Similar activities

Outcome 4 Safe working procedures during fault finding.

Outcome 4 Safe working procedures during fault finding.

Professional Development

20 Qs

Session 3 Symptoms of electrical faults.

Session 3 Symptoms of electrical faults.

Professional Development

20 Qs

NBF. ELECTRIFICACIÓN.PACO SALAS

NBF. ELECTRIFICACIÓN.PACO SALAS

Professional Development

15 Qs

CompTIA+/CCTV Test Questions

CompTIA+/CCTV Test Questions

Professional Development

15 Qs

PUN SEPTEMBER

PUN SEPTEMBER

Professional Development

20 Qs

Circuit Protection

Circuit Protection

9th Grade - Professional Development

20 Qs

10-01 day 8

10-01 day 8

Professional Development

19 Qs

positive isolation

positive isolation

Professional Development

20 Qs

GMJ 6035 electrical quiz NEW 6

GMJ 6035 electrical quiz NEW 6

Assessment

Quiz

Other

Professional Development

Hard

Created by

Glen Johnson

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be carried out before any electrical work takes place?

Safe isolation

Safe insulation

Safe continuity

Safe polarity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following units should be used to check if a circuit is dead?

Multimeter

RCD

Proving

OHMs

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests should be carried out on insulation?

Polarity

Resistance

Impedance

Continuity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The floor area covered by a ring final circuit must not exceed

25 m²

50 m²

75 m²

100 m²

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main protection on a domestic consumer unit is provided by which one of the following?

RCD

RBC

MCB

MCD

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 9.8 kw shower should be protected by a circuit breaker rated at

35 amp

40 amp

45 amp

50 amp

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests should be carried out to ensure that phase and neutral are not cross connected?

Polarity

Resistance

Impedance

Continuity

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?