
9189 - Phase 2 - Unit 305 - Cold Water Systems
Authored by Darren Richardson
Other
12th Grade
Used 15+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
How many UK fluid categories are there?
4
5
6
3
2.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
What temperature do the Water Regulations state that cold water must never reach?
10 degrees Celsius
15 degress Celsius
5 degrees Celsius
25 degrees Celsius
3.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
What are the two main considerations when installing a new incoming cold water supply?
Flow and colour
Temperature and pressure
Taste and temperature
Pressure and flow
4.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
Where should a drain-off valve be fitted?
Immediately above the internal stop valve and at every low point
At every appliance to aid system draining
Below the cold water storage cistern to avoid wasting water
Immediately below any appliance supplied by the mains
5.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
Between what depths should the service pipe be laid?
650 to 1300mm
800 to 1600mm
750 to 1350mm
350 to 700mm
6.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
If a tap washer in a tap is damaged, what would be the likely effect?
The tap would drip from the outlet
The tap would drip from the body
The tap would drip from the spindle
The tap would drip from the handle
7.
MULTIPLE CHOICE QUESTION
1 min • 5 pts
What material is a modern service pipe made from?
R250 half hard copper
Lead
ABS
MDPE
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?