Quality Mini Quiz

Quiz
•
Professional Development
•
Professional Development
•
Hard
Moldy Maulana
Used 6+ times
FREE Resource
6 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
1 min • 1 pt
A project team is unexpectedly audited. Several nonconformances were identified during the audit. Which three actions could the project manager have taken to prevent this situation? (Choose three)
Monitored conformance and quality standards
Anticipated potential nonconformance items.
Asked that the team remain ready for an audit
Ensured that the auditors were experienced
Rejected the unexpected audit request
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
While closing a project, the client finds some defects in the deliverable. What should the project manager do next?
Review the output against the acceptance criteria.
Extend the project until all deliverables are accepted
Persuade the client to accept the output as is
Pay the penalty for the defective item
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
For quality assurance, a quality audit was conducted on the processes being used in the project execution plan. One of the nonconformance issues raised by the auditor was that attendance lists for the project risk review meetings were unavailable.
Why is an attendance list important?
It is a document that is registered within the lessons learned register
It is a record that shows the number of attendees at the meeting
It is standard practice on projects to conduct optional risk review meetings
It is evidence that risk review meetings were held with the appropriate project team members
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
A project manager is leading a project to manufacture a new type of wheel for the automobile industry. The first lot of wheels has been created, and the project manager wants to know if the quality objectives have been met. What should the project manager do next?
Review the work breakdown structure
Perform a quality audit
Use the test and evaluation documents
Develop a quality report
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
You are the project manager reviewing the results of a quality report prepared by a team external to the project. The quality report indicates settings on a piece of equipment that are not configured to the exact specifications outlined in the quality management plan. What should you do immediately?
Speak with the team member who programmed the settings
Record the issue in the issue log
Review the quality management plan
Conduct a process analysis
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
You are managing a project to produce new smartwatches. Several inspections have been conducted during the manufacturing process, and defects of various types have been detected. You want to document these defects in a way that will specify how many defects of each type were found per inspection. Which tool is the best to use in this situation?
Control charts
Check sheets
Scatter diagrams
Pareto diagrams
Similar Resources on Wayground
10 questions
Stakeholder Engagement 10 soal (Chapter 13)

Quiz
•
Professional Development
10 questions
Communication 10 soal (Chapter 10)

Quiz
•
Professional Development
6 questions
Validate and Control Scope - Assignment

Quiz
•
Professional Development
10 questions
PMP - Roles & Organizations

Quiz
•
Professional Development
10 questions
RoadtoCertificate Week1

Quiz
•
Professional Development
10 questions
LO2 Project Life Cycles Quiz

Quiz
•
Professional Development
10 questions
Aura Deployment Part 2

Quiz
•
Professional Development
10 questions
IT General Control

Quiz
•
Professional Development
Popular Resources on Wayground
50 questions
Trivia 7/25

Quiz
•
12th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
11 questions
Negative Exponents

Quiz
•
7th - 8th Grade
12 questions
Exponent Expressions

Quiz
•
6th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade
20 questions
One Step Equations All Operations

Quiz
•
6th - 7th Grade
18 questions
"A Quilt of a Country"

Quiz
•
9th Grade