Building Technology Final Exam

Building Technology Final Exam

University

30 Qs

quiz-placeholder

Similar activities

CATS Quiz

CATS Quiz

University

27 Qs

NATIONAL LEVEL ONLINE QUIZ -CURRENT AFFAIRS

NATIONAL LEVEL ONLINE QUIZ -CURRENT AFFAIRS

University

30 Qs

Chapter 1 - Relationship Marketing

Chapter 1 - Relationship Marketing

University

25 Qs

Prelim Exam in Assessment of Learning 1

Prelim Exam in Assessment of Learning 1

University

25 Qs

English Prepositions classroom practice

English Prepositions classroom practice

University

25 Qs

Week 1 Assessment

Week 1 Assessment

7th Grade - University

25 Qs

Trivia - quiz (round 2)

Trivia - quiz (round 2)

University

25 Qs

City and County Government

City and County Government

KG - Professional Development

25 Qs

Building Technology Final Exam

Building Technology Final Exam

Assessment

Quiz

Education

University

Hard

Created by

iza wahab

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of geotechnical investigation in construction projects?

To design the layout of the building structure

To determine the maximum load that the soil can safely support

To schedule the construction timeline

To select the color scheme for the construction site

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the classification of soil that consists of decayed vegetable matter with low strength?

Rocks

Non-cohesive soils

Cohesive soils

Peat

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of conducting a consolidation test during geotechnical investigation?

To classify the soil particles based on size

To measure the soil's permeability

To determine the rate and magnitude of settlement in soils

To assess the load-bearing capacity of the soil

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main challenge that surface water can pose during foundation construction?

Preventing erosion around the foundation

Enhancing the stability of the foundation

Reducing the need for dewatering techniques

Interfering with the pouring and curing of concrete

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What method is used to remove water from a construction site to make it safe for work?

Sump Pumping

Grouting method using chemical

Load test to pile

Grouting method using cement

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a Damp Proof Course (DPC) in a building's plinth?

Preventing termite infestation

Enhancing visual comfort

Preventing rising damp

Controlling glare

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which passive daylighting system involves the use of skylights on the roof?

Internal courtyard

Clerestory Windows

Roof Monitors

Solar Tubes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?