Task 7 - Micro Combined Heat and Power

Task 7 - Micro Combined Heat and Power

Professional Development

7 Qs

quiz-placeholder

Similar activities

Heat Pump Quiz

Heat Pump Quiz

Professional Development

10 Qs

ASSESSMENT MANAGING RISKS

ASSESSMENT MANAGING RISKS

Professional Development

10 Qs

MarkFest 2022-2023

MarkFest 2022-2023

Professional Development

10 Qs

RTSF - Examination

RTSF - Examination

Professional Development

10 Qs

Funny Day

Funny Day

Professional Development

8 Qs

RR Transmittal Examination

RR Transmittal Examination

Professional Development

10 Qs

Task 4 Ground Source Heat Pump Systems Quiz

Task 4 Ground Source Heat Pump Systems Quiz

Professional Development

9 Qs

Task 7 - Micro Combined Heat and Power

Task 7 - Micro Combined Heat and Power

Assessment

Quiz

others

Professional Development

Medium

Created by

Brendan Cocks

Used 1+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is meant by 'heat-led'?

80% of the heat is used to produce heat to the property, whilst the power generation is secondary 15%.

50% of the heat is used to produce heat to the property, whilst the power generation is secondary 50%.

100% of the heat is used to produce heat to the property, whilst the power generation is secondary 0%.

30% of the heat is used to produce heat to the property, whilst the power generation is secondary 70%.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When will the unit produce electricity?

When there is a demand for heat

When there is a demand for cooling

When there is a demand for water

When there is a demand for gas

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What are the four key components of a mCHP?

The engine burner, The stirling engine generator, The supplementary burner, The heat exchanger

The engine burner, The stirling engine generator, The supplementary burner, The water pump

The engine burner, The stirling engine generator, The supplementary burner, The gas valve

The engine burner, The stirling engine generator, The supplementary burner, The air filter

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What are the location and building requirements for mCHP?

The building should have high demand for space heating. The larger the building the greater the carbon savings.

The building should have low demand for space heating. The smaller the building the greater the carbon savings.

The building should have high demand for cooling. The larger the building the greater the carbon savings.

The building should have low demand for cooling. The smaller the building the greater the carbon savings.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is one reason a building with good insulation might not be suitable for mCHP?

It has a high demand for space heating.

It is likely to have a demand for space heating.

It is unlikely to have a demand for space heating.

It is dependent on weather conditions.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is an advantage of installing mCHP?

It increases the building's carbon footprint.

It is dependent on building direction and weather conditions.

It generates electricity only when there is no demand for heat.

It saves carbon over centrally generated electricity.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is a disadvantage of installing an mCHP system?

The initial installation costs are low.

It is suitable for all properties.

It has limited capacity for electrical generation.

It has unlimited capacity for electrical generation.