Spec 1_Quiz 1

Spec 1_Quiz 1

University

15 Qs

quiz-placeholder

Similar activities

PP -SPP DOCS ANEX A

PP -SPP DOCS ANEX A

University

20 Qs

Prelim, Prime Cost, Prov Sum and Pro Rata

Prelim, Prime Cost, Prov Sum and Pro Rata

9th Grade - University

10 Qs

Construction Manpower Safety

Construction Manpower Safety

University

10 Qs

Architectural Layout and Design

Architectural Layout and Design

University

11 Qs

Quiz on Human Factors and Sustainability in Architecture

Quiz on Human Factors and Sustainability in Architecture

University

15 Qs

OFFICE PROJECT MANAGEMENT

OFFICE PROJECT MANAGEMENT

University

11 Qs

Professional Practice 2 UE Final Examination

Professional Practice 2 UE Final Examination

University

20 Qs

PP3 ODAR3 CSB FINAL EXAM

PP3 ODAR3 CSB FINAL EXAM

University

20 Qs

Spec 1_Quiz 1

Spec 1_Quiz 1

Assessment

Quiz

Architecture

University

Easy

Created by

Aira Altovar

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 1:

What are the main phases of a construction project life cycle?

A) Initiation, Design, Execution, Completion

B) Initiation, Planning, Execution, Monitoring and Control, Closure

C) Planning, Design, Procurement, Construction, Operation

D) Feasibility, Planning, Construction, Maintenance

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 2:

What is the primary task in the initiation phase of a construction project?

A) Developing detailed construction drawings

B) Project feasibility studies

C) Site preparation

D) Final inspections

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 3:

Which phase includes developing a risk management plan?

A) Initiation

B) Design

C) Planning

D) Procurement

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 4:

During which phase are subcontractors selected and materials purchased?

A) Design

B) Planning

C) Procurement

D) Construction

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 5:

What tasks are performed in the closeout phase of a construction project?

A) Site preparation and excavation

B) Final inspections and finalization of project documentation

C) Developing construction drawings

D) Conducting feasibility studies

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 6:

Which phase includes the creation of detailed construction drawings and specifications?

A) Initiation

B) Design

C) Procurement

D) Construction

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Question 7:

In which phase does actual site preparation and building take place?

A) Design

B) Planning

C) Construction

D) Closeout

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?