METHODS OF ESTIMATING

METHODS OF ESTIMATING

University

8 Qs

quiz-placeholder

Similar activities

RESOURCES SCHEDULING

RESOURCES SCHEDULING

University

10 Qs

budgeting Project quiz

budgeting Project quiz

University

5 Qs

Cost estimation Post Test

Cost estimation Post Test

University - Professional Development

10 Qs

Estimating 2

Estimating 2

University

10 Qs

Projects and Programs Management #3

Projects and Programs Management #3

University - Professional Development

10 Qs

DJJ6192 INDUSTRIAL MANAGEMENT - QUIZ 1

DJJ6192 INDUSTRIAL MANAGEMENT - QUIZ 1

University

10 Qs

Economics quiz

Economics quiz

University

10 Qs

Mindanao Power Situation & Power 101

Mindanao Power Situation & Power 101

University

12 Qs

METHODS OF ESTIMATING

METHODS OF ESTIMATING

Assessment

Quiz

Other

University

Easy

Created by

a'fifah khairunnisa zulkiflee

Used 2+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an early estimate in a project?

To ensure the project runs smoothly without any challenges
To waste time and resources
To confuse stakeholders and delay the project
To set initial expectations, plan resources, and identify potential risks.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are some factors considered in estimate considerations?

Project scope, resources required, time constraints, risks involved, historical data
Team preferences
Weather conditions
Budget constraints

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of UNIT RATES in construction cost estimation?

Unit rates are used to estimate labor costs only
Unit rates are irrelevant in construction cost estimation
Unit rates help in accurately pricing specific quantities of work based on standard units.
Unit rates are fixed values that do not change

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of FLOOR AREA in cost estimation?

To determine the color scheme for the interior design
To calculate the number of windows needed for the project
To determine the amount of space that needs to be covered or built upon, impacting materials and labor costs.
To estimate the total weight of the building materials

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the rules of measurement for calculating the Total cost using VOLUME method?

Total cost = Volume + Cost per unit volume
Total cost = Volume - Cost per unit volume
Total cost = Volume x Cost per unit volume
Total cost = Volume / Cost per unit volume

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of using a BILL OF QUANTITIES in construction projects?

To list down the quantity of bills needed for the project

To estimate the total cost of materials and labor required for the project

To determine the project timeline

To showcase the architectural design of the project

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does the concept of CONTINGENCY affect cost estimation in construction?

Contingency is an unnecessary expense that should be avoided

Contingency is a buffer amount included in the estimate to cover unforeseen circumstances or changes

Contingency is used to reduce the overall project cost

Contingency is only applicable to small construction projects

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to consider the LOCATION of a construction project in cost estimation?

Location has no impact on the cost of construction projects

Location affects the availability and cost of materials, labor, and permits

Location determines the color scheme of the project

Location is only relevant for residential projects