Plumbing level 2 - PP1- Hot water
Authored by Byron Morris
Professional Development
University
Used 122+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does WRAS stand for?
Water Regulation and Standards Scheme
Water Regulation and Safety Scheme
Water Regulation Association Scheme
Water Regulation Advisory Scheme
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which British Standard covers the design, installation, testing, and maintenance of water systems?
BS8000 pt15
BS6700
BS9999
BS1234
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum size of the vent pipe according to BS6700?
32mm
28mm
22mm
15mm
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a centralised instantaneous hot water system, what is commonly used to heat the water?
Immersion heater
Combination boiler
Solar panels
Electric heater
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary function of the open vent in an open vented system?
To increase water pressure
To act as a safety relief valve
To filter impurities
To regulate temperature
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum size of the CWSC if it feeds both hot and cold water systems?
200 litres
150 litres
115 litres
230 litres
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a direct hot water cylinder using a boiler, what is absent in the cylinder?
Vent pipe
Hot distribution pipe
Heat exchanger coil
Cold feed pipe
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?