Plumbing level 2 - PP1- Hot water

Plumbing level 2 - PP1- Hot water

University

10 Qs

quiz-placeholder

Similar activities

Plumbing Level 2 - PP1.1 - Cold water

Plumbing Level 2 - PP1.1 - Cold water

University

10 Qs

Avengers Aptitude

Avengers Aptitude

University - Professional Development

15 Qs

NCCER 02111 DWV 4.0 Quiz

NCCER 02111 DWV 4.0 Quiz

University

14 Qs

Plumbing level 2- PP-3.2- Hot water

Plumbing level 2- PP-3.2- Hot water

University

10 Qs

L2 Common Plumbing Processes PT2

L2 Common Plumbing Processes PT2

University - Professional Development

14 Qs

bldg. utilities

bldg. utilities

University

10 Qs

NFPA 25 5.4 review quiz

NFPA 25 5.4 review quiz

University

15 Qs

Plumbing level 2 - PP1.2 - Sanitation

Plumbing level 2 - PP1.2 - Sanitation

University

10 Qs

Plumbing level 2 - PP1- Hot water

Plumbing level 2 - PP1- Hot water

Assessment

Quiz

Professional Development

University

Easy

Created by

Byron Morris

Used 86+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does WRAS stand for?

Water Regulation and Standards Scheme

Water Regulation and Safety Scheme

Water Regulation Association Scheme

Water Regulation Advisory Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard covers the design, installation, testing, and maintenance of water systems?

BS8000 pt15

BS6700

BS9999

BS1234

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the vent pipe according to BS6700?

32mm

28mm

22mm

15mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a centralised instantaneous hot water system, what is commonly used to heat the water?

Immersion heater

Combination boiler

Solar panels

Electric heater

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent in an open vented system?

To increase water pressure

To act as a safety relief valve

To filter impurities

To regulate temperature

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the CWSC if it feeds both hot and cold water systems?

200 litres

150 litres

115 litres

230 litres

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a direct hot water cylinder using a boiler, what is absent in the cylinder?

Vent pipe

Hot distribution pipe

Heat exchanger coil

Cold feed pipe

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?