Search Header Logo

Plumbing level 2 - PP1- Hot water

Authored by Byron Morris

Professional Development

University

Used 122+ times

Plumbing level 2 - PP1- Hot water
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does WRAS stand for?

Water Regulation and Standards Scheme

Water Regulation and Safety Scheme

Water Regulation Association Scheme

Water Regulation Advisory Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standard covers the design, installation, testing, and maintenance of water systems?

BS8000 pt15

BS6700

BS9999

BS1234

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the vent pipe according to BS6700?

32mm

28mm

22mm

15mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a centralised instantaneous hot water system, what is commonly used to heat the water?

Immersion heater

Combination boiler

Solar panels

Electric heater

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent in an open vented system?

To increase water pressure

To act as a safety relief valve

To filter impurities

To regulate temperature

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size of the CWSC if it feeds both hot and cold water systems?

200 litres

150 litres

115 litres

230 litres

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a direct hot water cylinder using a boiler, what is absent in the cylinder?

Vent pipe

Hot distribution pipe

Heat exchanger coil

Cold feed pipe

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?