1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. The ___ is a pre-design stage of project development wherein the general concepts, other illustrations and typical drawings are presented. Hence, this will be the basis for Detailed Architectural and Engineering Design (DAED) phase where the design is refined, and plans, specifications, and estimates are established.
A. Conceptual Design
B. Innovative Design
C. Abstract Design
D. Theoretical Design
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
2. Defects Liability Period (DLP) from project completion to final acceptance
1 yr
2 yrs
3 years
5 years
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3. The contractor shall undertake the repair works, at his own expense, of any damage to the infrastructure on account of the use of materials of inferior quality, within_ days from the time the Head of the Procuring Entity has issued an order to undertake repair. Failure or refusal to comply with this mandate, the procuring entity shall undertake such repair works and shall be entitled to full reimbursement of expenses incurred therein upon demand.
30
90
60
120
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
4. The defects liability period shall be covered by the ____ of the contractor which shall guarantee that the contractor performs his responsibilities. If the contractor fails to comply with its obligations, the procuring entity shall forfeit its __ ... and perpetually disqualify it from participating in any public bidding.
Bid Bonds
B. Retention Money
C. Warranty Security
D. Performance Security
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For the procurement of goods, to assure that manufacturing defects shall be corrected by the supplier, a warranty security shall be required from the contract awardee for a minimum period of __ months and in the case of Expendable Supplies, or a minimum period of one (1) year.
3
6
7
9
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
6. The obligation for the warranty shall be covered by either retention money in an amount equivalent to at least of every progress payment, or a special bank guarantee equivalent to at least of the total contract price.
5%
15%
10%
20%
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The Module provides a
comprehensive construction
materials prices database that
supports the cost estimation process
from preparation, review/evaluation,
and down to approval of the Detailed
Unit Price Analysis (DUP A), Program
of Works (POW), and Approved
Budget for the Contract (ABC) which
shall commence on the 4th quarter of
calendar year 2023
CMPD
PMPD
MMPD
MCPD
Create a free account and access millions of resources
Similar Resources on Wayground
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade
Discover more resources for Architecture
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
9 questions
A Fine, Fine School Comprehension

Quiz
•
3rd Grade
12 questions
Passport Quiz 1

Quiz
•
1st - 5th Grade
10 questions
Place Value

Quiz
•
3rd Grade
8 questions
Writing Complete Sentences - Waiting for the Biblioburro

Lesson
•
3rd Grade
10 questions
Third Grade Angels Vocab Week 1

Quiz
•
3rd Grade
12 questions
New Teacher

Quiz
•
3rd Grade