1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. The ___ is a pre-design stage of project development wherein the general concepts, other illustrations and typical drawings are presented. Hence, this will be the basis for Detailed Architectural and Engineering Design (DAED) phase where the design is refined, and plans, specifications, and estimates are established.
A. Conceptual Design
B. Innovative Design
C. Abstract Design
D. Theoretical Design
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
2. Defects Liability Period (DLP) from project completion to final acceptance
1 yr
2 yrs
3 years
5 years
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3. The contractor shall undertake the repair works, at his own expense, of any damage to the infrastructure on account of the use of materials of inferior quality, within_ days from the time the Head of the Procuring Entity has issued an order to undertake repair. Failure or refusal to comply with this mandate, the procuring entity shall undertake such repair works and shall be entitled to full reimbursement of expenses incurred therein upon demand.
30
90
60
120
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
4. The defects liability period shall be covered by the ____ of the contractor which shall guarantee that the contractor performs his responsibilities. If the contractor fails to comply with its obligations, the procuring entity shall forfeit its __ ... and perpetually disqualify it from participating in any public bidding.
Bid Bonds
B. Retention Money
C. Warranty Security
D. Performance Security
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For the procurement of goods, to assure that manufacturing defects shall be corrected by the supplier, a warranty security shall be required from the contract awardee for a minimum period of __ months and in the case of Expendable Supplies, or a minimum period of one (1) year.
3
6
7
9
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
6. The obligation for the warranty shall be covered by either retention money in an amount equivalent to at least of every progress payment, or a special bank guarantee equivalent to at least of the total contract price.
5%
15%
10%
20%
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The Module provides a
comprehensive construction
materials prices database that
supports the cost estimation process
from preparation, review/evaluation,
and down to approval of the Detailed
Unit Price Analysis (DUP A), Program
of Works (POW), and Approved
Budget for the Contract (ABC) which
shall commence on the 4th quarter of
calendar year 2023
CMPD
PMPD
MMPD
MCPD
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
29 questions
Alg. 1 Section 5.1 Coordinate Plane
Quiz
•
9th Grade
22 questions
fractions
Quiz
•
3rd Grade
11 questions
FOREST Effective communication
Lesson
•
KG
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
Discover more resources for Architecture
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
22 questions
fractions
Quiz
•
3rd Grade
18 questions
Comparing Fractions with same numerator or denominator
Quiz
•
3rd Grade
15 questions
Fractions on a number line
Quiz
•
3rd Grade
10 questions
Area
Quiz
•
3rd Grade
100 questions
100 multiplication facts
Quiz
•
3rd Grade
16 questions
Equivalent fractions
Quiz
•
3rd Grade