1. The ___ is a pre-design stage of project development wherein the general concepts, other illustrations and typical drawings are presented. Hence, this will be the basis for Detailed Architectural and Engineering Design (DAED) phase where the design is refined, and plans, specifications, and estimates are established.

PE EXAM SET D1

Quiz
•
Architecture
•
3rd Grade
•
Medium
Ivan CAUBANG
Used 3+ times
FREE Resource
50 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A. Conceptual Design
B. Innovative Design
C. Abstract Design
D. Theoretical Design
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
2. Defects Liability Period (DLP) from project completion to final acceptance
1 yr
2 yrs
3 years
5 years
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3. The contractor shall undertake the repair works, at his own expense, of any damage to the infrastructure on account of the use of materials of inferior quality, within_ days from the time the Head of the Procuring Entity has issued an order to undertake repair. Failure or refusal to comply with this mandate, the procuring entity shall undertake such repair works and shall be entitled to full reimbursement of expenses incurred therein upon demand.
30
90
60
120
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
4. The defects liability period shall be covered by the ____ of the contractor which shall guarantee that the contractor performs his responsibilities. If the contractor fails to comply with its obligations, the procuring entity shall forfeit its __ ... and perpetually disqualify it from participating in any public bidding.
Bid Bonds
B. Retention Money
C. Warranty Security
D. Performance Security
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For the procurement of goods, to assure that manufacturing defects shall be corrected by the supplier, a warranty security shall be required from the contract awardee for a minimum period of __ months and in the case of Expendable Supplies, or a minimum period of one (1) year.
3
6
7
9
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
6. The obligation for the warranty shall be covered by either retention money in an amount equivalent to at least of every progress payment, or a special bank guarantee equivalent to at least of the total contract price.
5%
15%
10%
20%
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The Module provides a
comprehensive construction
materials prices database that
supports the cost estimation process
from preparation, review/evaluation,
and down to approval of the Detailed
Unit Price Analysis (DUP A), Program
of Works (POW), and Approved
Budget for the Contract (ABC) which
shall commence on the 4th quarter of
calendar year 2023
CMPD
PMPD
MMPD
MCPD
Create a free account and access millions of resources
Similar Resources on Quizizz
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade
Discover more resources for Architecture
14 questions
IREAD-3 Practice Test

Quiz
•
3rd Grade
10 questions
Identifying equations

Quiz
•
KG - University
10 questions
Perimeter of Polygons!

Quiz
•
3rd Grade
20 questions
Math Review

Quiz
•
3rd Grade
18 questions
Traits

Quiz
•
3rd Grade
16 questions
Chapter 8 - Getting Along with your Supervisor

Quiz
•
3rd Grade - Professio...
17 questions
Multiplication facts

Quiz
•
3rd Grade
15 questions
Third Grade Topics 1-16: Part 1

Quiz
•
3rd Grade