1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The ___ is a pre-design stage of project development wherein the general concepts, other illustrations and typical drawings are presented. Hence, this will be the basis for Detailed Architectural and Engineering Design (DAED) phase where the design is refined, and plans, specifications, and estimates are established.

A. Conceptual Design

B. Innovative Design

C. Abstract Design

D. Theoretical Design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Defects Liability Period (DLP) from project completion to final acceptance

1 yr

2 yrs

3 years

5 years

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. The contractor shall undertake the repair works, at his own expense, of any damage to the infrastructure on account of the use of materials of inferior quality, within_ days from the time the Head of the Procuring Entity has issued an order to undertake repair. Failure or refusal to comply with this mandate, the procuring entity shall undertake such repair works and shall be entitled to full reimbursement of expenses incurred therein upon demand.

30

90

60

120

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. The defects liability period shall be covered by the ____ of the contractor which shall guarantee that the contractor performs his responsibilities. If the contractor fails to comply with its obligations, the procuring entity shall forfeit its __ ... and perpetually disqualify it from participating in any public bidding.

Bid Bonds

B. Retention Money

C. Warranty Security

D. Performance Security

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For the procurement of goods, to assure that manufacturing defects shall be corrected by the supplier, a warranty security shall be required from the contract awardee for a minimum period of __ months and in the case of Expendable Supplies, or a minimum period of one (1) year.

3

6

7

9

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. The obligation for the warranty shall be covered by either retention money in an amount equivalent to at least of every progress payment, or a special bank guarantee equivalent to at least of the total contract price.

5%

15%

10%

20%

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Module provides a

comprehensive construction

materials prices database that

supports the cost estimation process

from preparation, review/evaluation,

and down to approval of the Detailed

Unit Price Analysis (DUP A), Program

of Works (POW), and Approved

Budget for the Contract (ABC) which

shall commence on the 4th quarter of

calendar year 2023

CMPD

PMPD

MMPD

MCPD

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Similar Resources on Wayground