Software Engineering- brush up

Software Engineering- brush up

Professional Development

24 Qs

quiz-placeholder

Similar activities

ULANGAN HARIAN PEKERJAAN DASAR DAN ELEKTROMEKANIK

ULANGAN HARIAN PEKERJAAN DASAR DAN ELEKTROMEKANIK

Professional Development

20 Qs

Bahasa Inggris

Bahasa Inggris

Professional Development

20 Qs

โครงสร้างและสมบัติของเยื่อหุ้มเซลล์

โครงสร้างและสมบัติของเยื่อหุ้มเซลล์

KG - Professional Development

20 Qs

MOSASPRAY_AUGUST

MOSASPRAY_AUGUST

Professional Development

20 Qs

Team Elsa Pre-test

Team Elsa Pre-test

Professional Development

20 Qs

2018 Pediatrics Residency Trivia Questions

2018 Pediatrics Residency Trivia Questions

University - Professional Development

20 Qs

science elements

science elements

9th Grade - Professional Development

20 Qs

High Voltage Tester requirements for SiC products

High Voltage Tester requirements for SiC products

Professional Development

20 Qs

Software Engineering- brush up

Software Engineering- brush up

Assessment

Quiz

Science

Professional Development

Practice Problem

Medium

Created by

Kimi R

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Waterfall model?

An iterative development model

A model emphasizing rapid prototyping

A model focused on user involvement throughout development

A linear and sequential software development model

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary characteristic of the Iterative model?

  • Sequential development

  • Emphasis on risk management

  • Minimal documentation

  • Continuous feedback and refinement

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main principle behind the Spiral model?

  • Iterative and incremental development

  • Linear and sequential development

  • Rapid prototyping

  • Risk-driven development

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main disadvantage of the Waterfall model?

  • High flexibility

  • Difficulty in accommodating changes

  • Rapid development pace

  • Emphasis on user involvement

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main principle behind the "Kanban" model in Agile development?

  • To emphasize rapid prototyping

  • To replace traditional project planning

  • To manage project budgets efficiently

  • To visualize and optimize the flow of work

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which model is often used in large-scale software development where a modular approach is necessary?

  • Incremental model

  • Spiral model

  • V-Model

  • RAD model

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary goal of the "Big Bang Model" in software development?

  • Sequential and organized development

  • Rapid prototyping

  • Quick development without a predefined plan

  • Comprehensive documentation

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?