Soundness Testing Quiz

Soundness Testing Quiz

12th Grade

•

54 Qs

quiz-placeholder

Similar activities

Arduino Programming

Arduino Programming

12th Grade

•

50 Qs

Tema de Estructuras completo (algunas en inglés)

Tema de Estructuras completo (algunas en inglés)

9th - 12th Grade

•

55 Qs

STRUCTURES 1º ESO

STRUCTURES 1º ESO

12th Grade

•

50 Qs

ICT 9 2nd Quarter Review

ICT 9 2nd Quarter Review

9th Grade - University

•

50 Qs

Digital Media Final

Digital Media Final

9th - 12th Grade

•

50 Qs

Woods Mid-term exam 2026

Woods Mid-term exam 2026

9th - 12th Grade

•

50 Qs

Electricity

Electricity

9th - 12th Grade

•

56 Qs

verifica 5a dicembre

verifica 5a dicembre

12th Grade

•

50 Qs

Soundness Testing Quiz

Soundness Testing Quiz

Assessment

Quiz

•

Instructional Technology

•

12th Grade

•

Practice Problem

•

Hard

Created by

George Ellison

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

54 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked during the visual inspection before soundness testing?

Open ends, soldered joints made, compression joints tight, clips are in place

Open ends, soldered joints made, compression joints loose, clips are missing

Closed ends, soldered joints made, compression joints tight, clips are in place

Open ends, unsoldered joints, compression joints tight, clips are in place

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the next step after the visual inspection in soundness testing?

Conducting a pressure test

Carrying out the soundness test

Performing a leak test

Conducting a flow test

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of pipes require different soundness tests?

Rigid pipe (copper and steel) and plastic pipe

Flexible pipe and plastic pipe

Rigid pipe (copper and steel) and flexible pipe

Copper pipe and steel pipe

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing and decommissioning process?

Set up equipment

Visual inspection

Test period

Final check

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after setting up the equipment in the testing and decommissioning process?

Visual inspection

Final check

Test period

Complete documentation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing and decommissioning process?

Final check

Test period

Complete documentation

Visual inspection

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the soundness testing of rigid pipes (copper and steel)?

Walk around the system and check for leaks

Slowly fill the system with water

Attach the hydraulic test bucket

Pump system up to 1.5 times the working pressure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Instructional Technology