Soundness Test Quiz

Soundness Test Quiz

12th Grade

56 Qs

quiz-placeholder

Similar activities

Electricity

Electricity

9th - 12th Grade

56 Qs

IGCSE ICT Theory

IGCSE ICT Theory

9th - 12th Grade

60 Qs

tin học  beoooo làm

tin học beoooo làm

KG - University

51 Qs

Core 2 Practice Quiz 1

Core 2 Practice Quiz 1

12th Grade

51 Qs

Earth and Life Science Long Quiz

Earth and Life Science Long Quiz

12th Grade

52 Qs

2018-09-21 Circuit, Symbols, Logic

2018-09-21 Circuit, Symbols, Logic

10th - 12th Grade

60 Qs

percision measuring

percision measuring

9th - 12th Grade

53 Qs

Tema de Estructuras completo (algunas en inglés)

Tema de Estructuras completo (algunas en inglés)

9th - 12th Grade

55 Qs

Soundness Test Quiz

Soundness Test Quiz

Assessment

Quiz

Instructional Technology

12th Grade

Hard

Created by

George Ellison

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

56 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before conducting a soundness test, what should you always do?

Check the water pressure

Walk around the system to make sure all joints have been made

Measure the temperature

Inspect the electrical wiring

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT part of the visual check before soundness testing?

Open ends

Soldered joints made

Compression joints tight

Measure the pipe length

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the soundness test mentioned in the document?

To check the electrical connections

To ensure the system is visually appealing

To verify the integrity of the joints and connections

To measure the system's efficiency

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of pipes require different soundness tests according to the document?

Copper and plastic pipes

Steel and aluminum pipes

Rigid pipe (copper and steel) and plastic pipe

Flexible and rigid pipes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing and decommissioning process?

Set up equipment

Visual inspection

Test period

Final check

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after setting up the equipment in the testing and decommissioning process?

Visual inspection

Final check

Test period

Complete documentation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing and decommissioning process?

Final check

Test period

Complete documentation

Visual inspection

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Instructional Technology