Estimating and Costing Quiz

Estimating and Costing Quiz

Assessment

Quiz

Life Project

University

Hard

Created by

Dr. Rawi

Used 1+ times

FREE Resource

Student preview

quiz-placeholder

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the factors that could influence the cost of concrete works?

Type of formwork

Size of the construction site

Quantity of water used

Color of cement

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the concrete strength (N/mm2) at 7 days for a mix ratio of 1:2:4?

14

20

30

17

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much does 1m3 of cement cost in Example 1.1?

RM28.00

RM10.50

RM120.27

RM35.00

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the labour cost for mixing concrete in Example 1.1?

RM40.00

RM50.00

RM170.27

RM10.00

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total cost per m3 for concrete in Example 1.2?

RM28.49

RM172.93

RM25.54

RM198.87

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much does 1 tonne of 16mm diameter high tensile steel reinforcement cost in Example 2.1?

RM2.75

RM2.60

RM2.56

RM2.79

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the cost per m2 for plywood formwork to horizontal soffit of slab in Example 3.1?

RM28.50

RM24.78

RM13.75

RM11.03

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Life Project