POB - Documentation Quiz

POB - Documentation Quiz

12th Grade

12 Qs

quiz-placeholder

Similar activities

h+s ppt1

h+s ppt1

12th Grade

15 Qs

Precautions required.2

Precautions required.2

12th Grade

14 Qs

Construction Industry Trivia Challenge

Construction Industry Trivia Challenge

12th Grade - University

15 Qs

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

307 Central Heating Systems 3 Quiz

307 Central Heating Systems 3 Quiz

2nd Grade - University

10 Qs

Motor Protection and Sizing Standards

Motor Protection and Sizing Standards

12th Grade

15 Qs

Understanding Listed Buildings and Heritage

Understanding Listed Buildings and Heritage

12th Grade

15 Qs

Understanding Building Materials

Understanding Building Materials

12th Grade

10 Qs

POB - Documentation Quiz

POB - Documentation Quiz

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Anthony Kwiecinski

Used 17+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should students be able to state according to the objectives?

The history of documentation

The types of documentation software

At least one reason why documents should be stored correctly

The process of creating new documentation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT something that site managers or trade supervisors can quickly tell from looking at the programme?

If work is keeping on schedule

What materials, equipment, and labour are required

When materials, equipment, and labour are required

The total cost of the project

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Which document is used to detail the costs associated with construction projects?

Invoice

Bill of Quantities

Construction Change Order

Receipt

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of window is located in the living room according to the schedule?

Inward opening tilt and turn composite aluminum and timber

Vertical sliding painted timber

Central pivot, fully reversible composite aluminum and timber

Inward opening timber bifold doors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of locking mechanism is used for the window in the bathroom?

Key lock

Lockable sash lock

Secure night vent

Trickle vents

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What additional information is provided for the window in the living room?

Paint color to be agreed with client

Secure night vent

Trickle vents

Fully reversible

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On what type of sites are schedules mainly used?

Smaller sites with uniform house designs

Larger sites with many different house designs

Urban sites with commercial buildings

Rural sites with agricultural buildings

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?