1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must be established before and after using explosives for demolition?
Safety nets
Exclusion zones
Water barriers
Noise barriers
Answer explanation
Exclusion zones must be established before and after using explosives for demolition to ensure the safety of individuals and property in the surrounding area.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which method of demolition is slower and completed by workmen?
Explosives
Machine
Hand Demolition
Hydraulic pushing arm
Answer explanation
Hand Demolition is slower and completed by workmen, making it the correct choice for a method of demolition that fits the description.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the final step in the six steps to demolition?
Pre-Demolition Survey
Check for Asbestos
Approve Demolition Plan
Have a waste disposal plan
Answer explanation
The final step in the six steps to demolition is to have a waste disposal plan.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important to have a waste disposal plan in demolition?
To ensure the building is structurally sound
To prevent health hazards
To manage debris and waste materials
To save costs
Answer explanation
To manage debris and waste materials
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the acronym "BS" in BS 6817 stand for?
British Standards
Building Standards
Basic Standards
Building Safety
Answer explanation
The acronym 'BS' in BS 6817 stands for British Standards, making it the correct choice among the options provided.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which step involves ensuring the building is free from hazardous materials?
Disconnect water/gas/electric
Check for Asbestos
Warn people in local area
Waste Disposal Plan
Answer explanation
The step that involves ensuring the building is free from hazardous materials is to Check for Asbestos.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be disconnected before demolition begins?
Water, gas, and electric
Internet and phone lines
Sewage and drainage
Heating and cooling systems
Answer explanation
Before demolition begins, it is crucial to disconnect water, gas, and electric to ensure safety and prevent accidents during the process.
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
Popular Resources on Wayground
25 questions
Multiplication Facts
Quiz
•
5th Grade
15 questions
4:3 Model Multiplication of Decimals by Whole Numbers
Quiz
•
5th Grade
10 questions
The Best Christmas Pageant Ever Chapters 1 & 2
Quiz
•
4th Grade
12 questions
Unit 4 Review Day
Quiz
•
3rd Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
15 questions
Solving Equations with Variables on Both Sides Review
Quiz
•
8th Grade
Discover more resources for Construction
10 questions
Understanding Meiosis
Interactive video
•
6th - 10th Grade
26 questions
Christmas Movie Trivia
Lesson
•
8th Grade - Professio...
28 questions
Ser vs estar
Quiz
•
9th - 12th Grade
10 questions
hands washing
Quiz
•
5th - 12th Grade
20 questions
Punnett Squares and Genetics
Quiz
•
9th Grade
10 questions
Exploring the Energy Cycle: Photosynthesis and Cellular Respiration
Interactive video
•
6th - 10th Grade
25 questions
photosynthesis and cellular respiration
Quiz
•
9th Grade
20 questions
Christmas Trivia
Quiz
•
5th - 12th Grade