1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be established before and after using explosives for demolition?

Safety nets

Exclusion zones

Water barriers

Noise barriers

Answer explanation

Exclusion zones must be established before and after using explosives for demolition to ensure the safety of individuals and property in the surrounding area.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method of demolition is slower and completed by workmen?

Explosives

Machine

Hand Demolition

Hydraulic pushing arm

Answer explanation

Hand Demolition is slower and completed by workmen, making it the correct choice for a method of demolition that fits the description.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the six steps to demolition?

Pre-Demolition Survey

Check for Asbestos

Approve Demolition Plan

Have a waste disposal plan

Answer explanation

The final step in the six steps to demolition is to have a waste disposal plan.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to have a waste disposal plan in demolition?

To ensure the building is structurally sound

To prevent health hazards

To manage debris and waste materials

To save costs

Answer explanation

To manage debris and waste materials

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the acronym "BS" in BS 6817 stand for?

British Standards

Building Standards

Basic Standards

Building Safety

Answer explanation

The acronym 'BS' in BS 6817 stands for British Standards, making it the correct choice among the options provided.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step involves ensuring the building is free from hazardous materials?

Disconnect water/gas/electric

Check for Asbestos

Warn people in local area

Waste Disposal Plan

Answer explanation

The step that involves ensuring the building is free from hazardous materials is to Check for Asbestos.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be disconnected before demolition begins?

Water, gas, and electric

Internet and phone lines

Sewage and drainage

Heating and cooling systems

Answer explanation

Before demolition begins, it is crucial to disconnect water, gas, and electric to ensure safety and prevent accidents during the process.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?