NPBES Leereenheid 8

NPBES Leereenheid 8

University

10 Qs

quiz-placeholder

Similar activities

Collaboration in Robotics Engineering

Collaboration in Robotics Engineering

9th Grade - University

15 Qs

Operaciones con Lenguajes

Operaciones con Lenguajes

University

10 Qs

Exam ?'s Given - SWE Final Ch 7, 8, 9, & Impacts of Computing

Exam ?'s Given - SWE Final Ch 7, 8, 9, & Impacts of Computing

University

14 Qs

Chapter Eight

Chapter Eight

University

15 Qs

LONGTEST_PRELIM_SIA2

LONGTEST_PRELIM_SIA2

University

15 Qs

SWT301-topic-1

SWT301-topic-1

University

15 Qs

Testing software

Testing software

1st Grade - University

12 Qs

Quizizz

Quizizz

University

10 Qs

NPBES Leereenheid 8

NPBES Leereenheid 8

Assessment

Quiz

Computers

University

Hard

Created by

Tina Niekerk

Used 3+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

_____is the degree to which a set of inherent characteristics fulfills requirements.

Quality

Conformance to requirements

Fitness for use

Reliability

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the purpose of project quality management?

To produce the highest-quality products and services possible

To ensure that appropriate quality standards are met

To ensure that the project will satisfy the needs for which it was undertaken

All of the above

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

___generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside the performing organization.

Quality audits

Design of experiments

Six Sigma

Benchmarking

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What does the term kaizen mean?

Minimize waste

Maximize value

Do it right the first time

Improvement

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What tool can you use to determine whether a process is in control or out of control?

A cause-and-effect diagram

A control chart

A run chart

A control panel diagram

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Six Sigma’s target for perfection is the achievement of no more than defects, errors, or mistakes per million opportunities.

6

9

3.4

1

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

The seven run rule states that if seven data points in a row on a control chart are all below the mean, above the mean, or all increasing or decreasing, then the process needs to be examined for ____problems.

random

nonrandom

Six Sigma

quality

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?