NPBES Leereenheid 8

NPBES Leereenheid 8

University

10 Qs

quiz-placeholder

Similar activities

CID421 Introduction to 3D CAD SOLIDWORK

CID421 Introduction to 3D CAD SOLIDWORK

University

12 Qs

Python Basic Quiz

Python Basic Quiz

11th Grade - University

10 Qs

Video Watermaking

Video Watermaking

University

11 Qs

GIS Unit-1

GIS Unit-1

University

15 Qs

Microcontroller

Microcontroller

11th Grade - University

10 Qs

Input, output and storage de

Input, output and storage de

8th Grade - Professional Development

14 Qs

Computer Architecture Unit 3

Computer Architecture Unit 3

University

15 Qs

Assessment 08

Assessment 08

University

15 Qs

NPBES Leereenheid 8

NPBES Leereenheid 8

Assessment

Quiz

Computers

University

Practice Problem

Hard

Created by

Tina Niekerk

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

_____is the degree to which a set of inherent characteristics fulfills requirements.

Quality

Conformance to requirements

Fitness for use

Reliability

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the purpose of project quality management?

To produce the highest-quality products and services possible

To ensure that appropriate quality standards are met

To ensure that the project will satisfy the needs for which it was undertaken

All of the above

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

___generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside the performing organization.

Quality audits

Design of experiments

Six Sigma

Benchmarking

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What does the term kaizen mean?

Minimize waste

Maximize value

Do it right the first time

Improvement

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What tool can you use to determine whether a process is in control or out of control?

A cause-and-effect diagram

A control chart

A run chart

A control panel diagram

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Six Sigma’s target for perfection is the achievement of no more than defects, errors, or mistakes per million opportunities.

6

9

3.4

1

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

The seven run rule states that if seven data points in a row on a control chart are all below the mean, above the mean, or all increasing or decreasing, then the process needs to be examined for ____problems.

random

nonrandom

Six Sigma

quality

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?