Phase4.mod9ECV

Phase4.mod9ECV

Professional Development

6 Qs

quiz-placeholder

Similar activities

CC Pretest

CC Pretest

Professional Development

10 Qs

Famous scientists

Famous scientists

1st Grade - Professional Development

10 Qs

KAMPUS April Quiz

KAMPUS April Quiz

Professional Development

11 Qs

Quality Day 22 Oct 2021

Quality Day 22 Oct 2021

Professional Development

10 Qs

The future of mars exploration

The future of mars exploration

1st Grade - Professional Development

10 Qs

Glove Dipping Process in Production

Glove Dipping Process in Production

University - Professional Development

10 Qs

CRC Day Mock Trial (May 19)

CRC Day Mock Trial (May 19)

Professional Development

10 Qs

Deforestation project week

Deforestation project week

2nd Grade - Professional Development

10 Qs

Phase4.mod9ECV

Phase4.mod9ECV

Assessment

Quiz

Science

Professional Development

Practice Problem

Medium

Created by

Craig Boothright

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the handle on an emergency /meter control valve must always:

Fall to the off position.

Fall to the on position.

Be electrically insulated.

Have 180o Travel.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The responsibility for installation and repair to a emergency/meter control lies with:

The property owner.

The gas supplier.

The gas transporter.

The gas operative.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a supply to a property incorporates a house entry tee:

This may be used as an alternative emergency control by the gas operative.

This must not be used as an alternative emergency control by the gas operative.

This may be used as an alternative emergency control by the consumer.

This may be used as a regulating valve by the gas transporter.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a meter is fitted within an outside meter box, the emergency meter control must always be located:

Within the meter box.

Within the building.

On the outlet side of the meter.

On the outlet side of the regulator.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When remote external meter boxes are installed to supply gas to a property, in addition to all the usual controls the installation requires an intternal:

Meter regulator.

Emergency control valve.

Test point.

Meter.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When an internal meter position is identified without the inclusion of a house entry tee, then the operative must:

Inform the gas transporter.

Inform the HSE.

Not test for let by.

This installation is satisfactory.