SDD 9.1.2 Software Development Approaches

SDD 9.1.2 Software Development Approaches

12th Grade

20 Qs

quiz-placeholder

Similar activities

Waterfall Model Quiz

Waterfall Model Quiz

12th Grade

18 Qs

NPTEL Software Engineering Quiz

NPTEL Software Engineering Quiz

12th Grade

15 Qs

1.2.3 Systems Development

1.2.3 Systems Development

12th Grade

15 Qs

Software Development Life Cycle (practice)

Software Development Life Cycle (practice)

10th - 12th Grade

20 Qs

System Development Life Cycle

System Development Life Cycle

12th Grade

20 Qs

SDD 9.1.2 Software Development Approaches

SDD 9.1.2 Software Development Approaches

12th Grade

20 Qs

Computer Software Maintenance

Computer Software Maintenance

9th - 12th Grade

15 Qs

Unit 3 Vocabulary Quiz

Unit 3 Vocabulary Quiz

9th - 12th Grade

17 Qs

SDD 9.1.2 Software Development Approaches

SDD 9.1.2 Software Development Approaches

Assessment

Quiz

Computers

12th Grade

Medium

Created by

Liam Dunphy

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A large bank is introducing a new computer-based system.

Parts of the old system will be replaced one by one until the new system is in place.

Which implementation method is being used by the bank?

Phased

Parallel

Prototyping

Direct cut over

Answer explanation

The bank is implementing the new system by replacing parts of the old system one by one until the new system is fully in place, which is characteristic of the phased implementation method.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

The leaflet shown is sent by a web design company to potential customers.

Which software development approach is being described in this leaflet?

End user

Pilot

Prototyping

Structured

Answer explanation

The leaflet describes the process of quickly creating a model of the website to gather feedback and make improvements, which aligns with the Prototyping software development approach.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is the most effective in managing changes and versions during system development?

CASE tools

Gantt charts

Progress logs

Document flowcharts

Answer explanation

CASE tools are the most effective in managing changes and versions during system development as they provide comprehensive support for version control, change management, and documentation.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

Which row of the table best matches an installation method with a valid reason for choosing that method?

Pilot - The new system is only for a small number of users

Direct cut over - Training time is needed in the new system

Parallel - The availability of the data in the system is critical

Phased - Resources are not available for a proper trial of the new system

Answer explanation

The best match is Parallel because it allows for the critical data to remain available during the transition to the new system.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is usually a benefit of using the pilot method of installation?

The development time is reduced.

A backup of data is created for each new transaction.

The personnel involved can be available to train others.

CASE tools can be more effectively used.

Answer explanation

The personnel involved can be available to train others, which is a benefit of using the pilot method of installation.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A company needs to replace its existing software but
it does not have any software development capabilities.

Which of the following best solves this problem?

Develop the software inhouse

Outsource the development of the software

Simplify the specifications for the new software

Buy off-the-shelf software that meets some requirements

Answer explanation

Outsourcing the development of the software is the best solution as the company lacks software development capabilities.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A company spent a month training its staff before replacing its main software.

After training was completed, the company switched to the new software.

Which installation method was used?

Pilot

Phased

Parallel

Direct cut over

Answer explanation

The company directly switched to the new software after training, indicating a direct cut over installation method.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?