SDD 9.1.2 Software Development Approaches

SDD 9.1.2 Software Development Approaches

12th Grade

20 Qs

quiz-placeholder

Similar activities

Python List

Python List

4th Grade - University

15 Qs

QUIZ BAB 4: SISTEM OPERASI

QUIZ BAB 4: SISTEM OPERASI

8th Grade - University

20 Qs

GAD Review - Game Industry

GAD Review - Game Industry

9th - 12th Grade

22 Qs

1.1.1 The structure and function of the processor

1.1.1 The structure and function of the processor

11th Grade - University

15 Qs

Network topologies

Network topologies

8th Grade - University

20 Qs

Quiz 1

Quiz 1

1st - 12th Grade

15 Qs

Remidi UTS AIJ

Remidi UTS AIJ

12th Grade

20 Qs

Arduino Loop

Arduino Loop

2nd Grade - University

20 Qs

SDD 9.1.2 Software Development Approaches

SDD 9.1.2 Software Development Approaches

Assessment

Quiz

Computers

12th Grade

Practice Problem

Medium

Created by

Liam Dunphy

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A large bank is introducing a new computer-based system.

Parts of the old system will be replaced one by one until the new system is in place.

Which implementation method is being used by the bank?

Phased

Parallel

Prototyping

Direct cut over

Answer explanation

The bank is implementing the new system by replacing parts of the old system one by one until the new system is fully in place, which is characteristic of the phased implementation method.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

The leaflet shown is sent by a web design company to potential customers.

Which software development approach is being described in this leaflet?

End user

Pilot

Prototyping

Structured

Answer explanation

The leaflet describes the process of quickly creating a model of the website to gather feedback and make improvements, which aligns with the Prototyping software development approach.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is the most effective in managing changes and versions during system development?

CASE tools

Gantt charts

Progress logs

Document flowcharts

Answer explanation

CASE tools are the most effective in managing changes and versions during system development as they provide comprehensive support for version control, change management, and documentation.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

Which row of the table best matches an installation method with a valid reason for choosing that method?

Pilot - The new system is only for a small number of users

Direct cut over - Training time is needed in the new system

Parallel - The availability of the data in the system is critical

Phased - Resources are not available for a proper trial of the new system

Answer explanation

The best match is Parallel because it allows for the critical data to remain available during the transition to the new system.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following is usually a benefit of using the pilot method of installation?

The development time is reduced.

A backup of data is created for each new transaction.

The personnel involved can be available to train others.

CASE tools can be more effectively used.

Answer explanation

The personnel involved can be available to train others, which is a benefit of using the pilot method of installation.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A company needs to replace its existing software but
it does not have any software development capabilities.

Which of the following best solves this problem?

Develop the software inhouse

Outsource the development of the software

Simplify the specifications for the new software

Buy off-the-shelf software that meets some requirements

Answer explanation

Outsourcing the development of the software is the best solution as the company lacks software development capabilities.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A company spent a month training its staff before replacing its main software.

After training was completed, the company switched to the new software.

Which installation method was used?

Pilot

Phased

Parallel

Direct cut over

Answer explanation

The company directly switched to the new software after training, indicating a direct cut over installation method.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?