1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The distance from the street to the front of a structure is called a(n) _____.

front setback

right of way

foundation easement

greenway

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Section drawings are used in both architectural and _____.

structural plans

roof plans

floor plans

site plans

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a finish schedule, each room is identified by its _____.

name and number

primary purpose

overall square feet

scheduled completion date

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Submittal drawings are usually prepared by _____.

contractors

supervisors

equipment manufacturers

architects

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The material symbol shown in Figure RQ01 represents _____.

loose fill or batts

common brick

rubble

concrete

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The plumbing symbol shown in Figure RQ02 represents a(n) _____.

shower

lavatory

recessed radiator

water heater

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a line on a drawing measures 4" in length and the drawing scale is ¼" = 1'-0", the line represents an item that is _____.

4' long

8' long

12' long

16' long

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?