404 HVAC Pre-Test

404 HVAC Pre-Test

Vocational training

25 Qs

quiz-placeholder

Similar activities

Chapter 8 and 9 Review

Chapter 8 and 9 Review

KG - University

25 Qs

EPA 608 Review -- CORE pt 2 (English)

EPA 608 Review -- CORE pt 2 (English)

12th Grade - University

30 Qs

Review Questions for Grade 4 Refrigeration

Review Questions for Grade 4 Refrigeration

KG - University

20 Qs

env ppt 1 2-2

env ppt 1 2-2

KG - University

25 Qs

EPA 608 Review -- CORE pt 3

EPA 608 Review -- CORE pt 3

12th Grade

30 Qs

CORE TEST 1

CORE TEST 1

9th - 12th Grade

30 Qs

Building Maintenance Quiz

Building Maintenance Quiz

Professional Development

20 Qs

HVAC Units Module: Introduction and Objectives Quiz

HVAC Units Module: Introduction and Objectives Quiz

KG - University

30 Qs

404 HVAC Pre-Test

404 HVAC Pre-Test

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Alex Atkinson

Used 3+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Suction gas temperature minus saturated suction temperature equals

subcooling

condensing temperature

superheat

evaporator operating temperature

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When soldering, solder is drawn into the joint by

the heat of the torch.

capillary action.

gravity.

flux.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On centrifugal pumps, if it is ever necessary to reduce pump flow temporarily, do so by

throttling the discharge

throttling the suction line

both A and B

none of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The seal in a compressor is necessary to prevent

refrigerant from leaking out at the rotating shaft.

air from leaking out at the rotating shaft.

oil from leaking out at the rotating shaft.

Both A and C from above.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following gases must never be used to pressurize or leak test a refrigeration system?

nitrogen

oxygen

CO2

helium

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A dual-element fuse has:

two normal one-time fuse links

a thermal cutout only

a thermal cutout and a normal fuse link

the ability to carry locked-rotor current of a motor but not to protect against short circuits.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The refrigerant line that connects the condenser to the metering device is the ___________ line.

discharge

expansion

liquid

suction

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?