1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What is the purpose of an initial verification?

A) To ensure that the installation complies with Part P of the building regulations

B) To assess the general condition of the installation for continued service

C) To confirm that the installation is safe and complies with BS 7671

D) To identify the cause of a fault in the installation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Which test instrument is required to carry out an insulation resistance test?

A) Earth fault loop impedance tester

B) RCD tester

C) Insulation resistance tester

D) Continuity tester

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. What is the minimum insulation resistance value for an installation with a nominal voltage of up to 500V?

A) 0.5 MΩ

B) 1 MΩ

C) 2 MΩ

D) 5 MΩ

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. Which of the following tests should be carried out first during the inspection and testing process?

A) Continuity of protective conductors

B) Insulation resistance

C) Polarity

D) Earth fault loop impedance

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. What is the purpose of the Zs test?

A) To measure the prospective short circuit current

B) To verify that the polarity is correct

C) To ensure that the circuit can safely disconnect in the event of a fault

D) To check the integrity of bonding conductors

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. When testing an RCD, which test simulates a fault to check if the device operates correctly?

A) Continuity test

B) RCD test

C) Insulation resistance test

D) Loop impedance test

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

8. What is the primary reason for performing a continuity test on protective conductors?

A) To ensure the live and neutral conductors are not cross-connected

B) To confirm the earth fault loop impedance

C) To verify the effectiveness of the earthing system

D) To measure the insulation resistance

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?