1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first measurement needed to calculate a slope?
Horizontal distance between two points
Vertical height of a building
Width of a road
Depth of a trench
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the common equation for finding slope in surveying?
Rise over run
Length times width
Height plus depth
Width divided by length
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a tape measure used for?
Measuring the distance between two points
Measuring temperature
Measuring weight
Measuring time
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What equipment is used as markers to measure over long distances?
Leveling rod
Chaining ring and pins
Tripod
Hand-sighting level
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary function of a leveling rod?
To measure temperature
To measure the difference in vertical height between two points
To measure weight
To measure time
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is attached to the base of a tripod to ensure it is over an exact point?
Leveling rod
Plumb bob
Tape measure
Chaining ring
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the most important part of setting up the tripod level?
Adjusting the telescope
Ensuring the tripod plate is level
Tightening all screws
Placing the tripod cap
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?