Agricultural Soils Managment Practices

Quiz
•
Science
•
9th - 12th Grade
•
Easy
+6
Standards-aligned
Milan Pozderac
Used 1+ times
FREE Resource
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Grasses, legumes, and forbs for seasonal cover and other conservation purposes. Grown primarily to improve and protect the soil between periods of regular crop production, or a crop grown between trees and vines in orchards and vineyards.
Permanent Pasture or Woodland
Cover Crops
No Till
Grassed Waterway
Strip Cropping
Tags
NGSS.MS-LS2-5
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Limiting soil disturbance to manage the amount, orientation and distribution of crop and plant residue on the soil surface year around.
Permanent Pasture or Woodland
Cover Crops
No Till
Grassed Waterway
Strip Cropping
Tags
NGSS.MS-LS1-5
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A shaped channel planted with fine grasses a broad and shallow cross section to a stable outlet.
Permanent Pasture or Woodland
Cover Crops
No Till
Grassed Waterway
Strip Cropping
Tags
NGSS.MS-LS2-4
NGSS.MS-LS2-5
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Growing planned rotations of row crops, forages, small grains, or fallow in a systematic arrangement along the natural contour of the land of equal width strips across a field.
Permanent Pasture or Woodland
Cover Crops
No Till
Grassed Waterway
Strip Cropping
Tags
NGSS.MS-ESS3-4
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Land is so steep that it cannot be cropped. Land can only be used for grazing or forest production.
Permanent Pasture or Woodland
Cover Crops
No Till
Grassed Waterway
Strip Cropping
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An area of trees and/or shrubs located adjacent to and up-gradient from water bodies. Riparian buffers are installed on areas adjacent to permanent or intermittent streams, lakes, ponds, wetlands and areas with groundwater recharge.
Heavy Use Pads
Controlled Traffic
Surface Drainage
Riparian Buffers/Buffer Strip
Crop Rotation
Tags
NGSS.MS-LS2-4
NGSS.MS-LS2-5
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An open drainage ditch constructed to a designed size and grade.
Heavy Use Pads
Controlled Traffic
Surface Drainage
Riparian Buffers/Buffer Strip
Crop Rotation
Tags
NGSS.MS-ETS1-3
Create a free account and access millions of resources
Similar Resources on Wayground
15 questions
Mineral Mining

Quiz
•
9th Grade - University
15 questions
Extracting Rocks and Minerals

Quiz
•
11th Grade
19 questions
Geology and Mineral Resources

Quiz
•
11th - 12th Grade
15 questions
Watershed

Quiz
•
7th Grade - University
20 questions
Chapter 16 Mineral and Mineral Resources

Quiz
•
11th - 12th Grade
20 questions
Earth's Resources

Quiz
•
9th - 12th Grade
19 questions
Mining and Minerals 2

Quiz
•
9th Grade
15 questions
Mining and Mineral Resources

Quiz
•
9th Grade - University
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade