The video tutorial covers the process of constructing a foundation, starting with setting up posts and marking the foundation corners. It then moves on to removing topsoil and preparing the site with a geo-textile membrane. The foundation layout is marked, and digging begins, followed by placing rebar and setting up shuttering with polystyrene for insulation. Finally, concrete is poured, and the slab is finished, with attention to compaction and insulation.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the construction process described in the video?

Hammering the posts of wall and foundation axes

Pouring concrete

Placing the geo-textile membrane

Compacting the gravel

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is used to ensure the planks are level?

A measuring tape

A level

A string

A ruler

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the geo-textile membrane?

To support the rebar

To provide insulation

To mark the foundation corners

To keep different layers from mixing and increase ground load bearing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much top soil is removed during the preparation?

10-20cm

40-50cm

20-30cm

30-40cm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the load capacity of the crane at 10 meters?

1.5 tons

2 tons

1 ton

500kg

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the diameter of the rebar used at the bottom and top of the foundation?

10mm

12mm

14mm

16mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What material is used for shuttering and insulation of the foundations?

Wood

Concrete

Extruded polystyrene

Metal

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the grade of the concrete used in the first pour?

C35/40

C30/35

C25/30

C20/25

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the thickness of the slab poured in the final step?

16 cm

14 cm

12 cm

10 cm

10.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is used to keep the bottom and top rebar meshes at a distance?

Wooden stakes

Concrete blocks

Metal rods

Plastic spacers