Health and Safety Quiz

Health and Safety Quiz

Professional Development

8 Qs

quiz-placeholder

Similar activities

Hazard Assessment for Skid Steer

Hazard Assessment for Skid Steer

Professional Development

3 Qs

ICE BREAKING INTERNAL TRAINING

ICE BREAKING INTERNAL TRAINING

Professional Development

5 Qs

 Timber Quiz Year 1

Timber Quiz Year 1

Professional Development

10 Qs

Excavation and Paver Installation Quiz

Excavation and Paver Installation Quiz

Professional Development

10 Qs

Understanding Transformer Concepts

Understanding Transformer Concepts

Professional Development

12 Qs

U11.1.1-2Hydrogen and Biomass Fuels Worksheet

U11.1.1-2Hydrogen and Biomass Fuels Worksheet

Professional Development

10 Qs

Health and Safety Quiz

Health and Safety Quiz

Assessment

Quiz

Construction

Professional Development

Hard

Created by

Joanna Malinska

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a detail required in an F10 document?

Address of the site

Number of operatives working

Environmental impact assessment

Details of principal designer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for ensuring the health and safety during the operation of designed items?

The construction workers

The local authority

The designers and manufacturers

The project manager

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the HSE stand for?

Health and Safety Evaluation

Health and Safety Executive

Health and Safety Examination

Health and Safety Enforcement

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What percentage of construction accidents could have been prevented at the design stage according to the CDM Regulations 2015?

25%

50%

35%

40%

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for setting up the construction phase health and safety plan?

The client

The principal designer

The principal contractor

The design team

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the term "site induction" refer to?

The process of hiring new workers.

The presentation that makes new visitors or workers aware of site rules and hazards.

The financial induction of the project.

The introduction of new construction materials.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must the principal designer assist the client with?

Designing the building layout

Identifying and collating pre-construction information

Hiring construction workers

Supervising the construction site

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the key term used to describe the adequacy of facilities provided on a construction site?

Efficient and effective

Suitable and sufficient

Adequate and ample

Proper and plentiful