Search Header Logo

9189 Phase 2 Central Heating PP 7

Authored by Steve Watson

Other

3rd Grade

Used 1+ times

9189 Phase 2 Central Heating PP 7
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of positioning in central heating systems?

To ensure proper heat distribution

To make it look pretty

To save space

To reduce noise

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the function of port A in the three-port mid-position valve?

Flow for the boiler

Central heating

Hot water

None of the above.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Port B in the three-port mid-position valve is used for what purpose?

Central heating

Hot water

Flow for the boiler

All of the above.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What material is the expansion vessel's cylinder made of?

Plastic

Steel

Copper

Aluminum

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the expansion vessel normally installed?

On the flow

On the return

On the supply

On the drain

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens to the diaphragm when the water expands?

It moves forward

It moves backward

It stays in place

It bursts

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is compressed when the diaphragm moves backward?

Water

Air

Steam

Oil

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?