
9189 Phase 2 Central Heating PP 7
Authored by Steve Watson
Other
3rd Grade
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of positioning in central heating systems?
To ensure proper heat distribution
To make it look pretty
To save space
To reduce noise
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the function of port A in the three-port mid-position valve?
Flow for the boiler
Central heating
Hot water
None of the above.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Port B in the three-port mid-position valve is used for what purpose?
Central heating
Hot water
Flow for the boiler
All of the above.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What material is the expansion vessel's cylinder made of?
Plastic
Steel
Copper
Aluminum
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is the expansion vessel normally installed?
On the flow
On the return
On the supply
On the drain
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What happens to the diaphragm when the water expands?
It moves forward
It moves backward
It stays in place
It bursts
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is compressed when the diaphragm moves backward?
Water
Air
Steam
Oil
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?