t-level Construction Project Documentation Quiz

t-level Construction Project Documentation Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Electrical Technology NCCER (11th Edition) Module 5 Review

Electrical Technology NCCER (11th Edition) Module 5 Review

9th - 12th Grade

15 Qs

307 Central Heating Systems 3 Quiz

307 Central Heating Systems 3 Quiz

2nd Grade - University

10 Qs

MTL2 Hot Water Learner Outcome 6

MTL2 Hot Water Learner Outcome 6

12th Grade

15 Qs

Understanding Domestic Wiring

Understanding Domestic Wiring

12th Grade

15 Qs

8710_350 T-level SI Units Quiz

8710_350 T-level SI Units Quiz

12th Grade

15 Qs

Understanding Construction Design Principles

Understanding Construction Design Principles

12th Grade

20 Qs

Types of Foundations, Floors, Walls, and Roofs

Types of Foundations, Floors, Walls, and Roofs

12th Grade

15 Qs

Welding Methods Quiz

Welding Methods Quiz

12th Grade

20 Qs

t-level Construction Project Documentation Quiz

t-level Construction Project Documentation Quiz

Assessment

Quiz

Construction

12th Grade

Practice Problem

Medium

Created by

Trevor Armstrong

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a formal agreement between a contractor and the client for a construction project based on the information provided?

Take-off sheet

Contract

Schedule of rates

Estimate

Answer explanation

A formal agreement between a contractor and the client for a construction project is called a 'Contract'. It outlines the terms, responsibilities, and scope of work, ensuring both parties are aligned on expectations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document accompanies a shipment from a supplier and describes the goods and quantities being delivered?

Quotation

Delivery note

Purchase order

Wiring diagram

Answer explanation

The delivery note is the document that accompanies a shipment, detailing the goods and their quantities. It serves as proof of delivery and helps the recipient verify the items received against the order.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document is a fixed price for goods and services offered by contractors or subcontractors to potential clients?

Quotation

Schedule of rates

Take-off sheet

Wiring diagram

Answer explanation

A quotation is a document that provides a fixed price for goods and services from contractors or subcontractors to potential clients, making it the correct choice for this question.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document is a technical drawing provided by the client to building services engineers for the installation of electrical systems?

Wiring diagram

Delivery note

Schedule of rates

Quotation

Answer explanation

A wiring diagram is a technical drawing that provides detailed information on the installation of electrical systems, making it essential for building services engineers. The other options do not serve this purpose.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an agreed schedule of costs for building materials for a set period between contractors and suppliers?

Schedule of rates

Estimate

Contract

Take-off sheet

Answer explanation

A schedule of rates is a pre-agreed list of costs for building materials, allowing contractors and suppliers to reference prices for a specific period. This makes it the correct choice for the question.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document is a prediction of costs for building work provided by contractors to clients?

Estimate

Bill of quantities

Purchase order

Wiring diagram

Answer explanation

An estimate is a document that provides a prediction of costs for building work, helping clients understand potential expenses before the project begins. Other options like bill of quantities and purchase orders serve different purposes.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is used by estimators to calculate quantities of building materials and labor costs from working drawings and specifications?

Take-off sheet

Contract

Quotation

Delivery note

Answer explanation

A take-off sheet is used by estimators to quantify building materials and labor costs based on working drawings and specifications, making it the correct choice for this purpose.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?