BPI-Control Chart&PCI

BPI-Control Chart&PCI

Professional Development

7 Qs

quiz-placeholder

Similar activities

APQP

APQP

1st Grade - Professional Development

10 Qs

SOAR Quiz

SOAR Quiz

Professional Development

10 Qs

BRM Review Quiz

BRM Review Quiz

University - Professional Development

10 Qs

Basic Coverages

Basic Coverages

Professional Development

10 Qs

AES Quizz 1

AES Quizz 1

Professional Development

10 Qs

Organizational Structure

Organizational Structure

6th Grade - Professional Development

10 Qs

PPED_Recit#1

PPED_Recit#1

Professional Development

10 Qs

Ambush Marketing

Ambush Marketing

University - Professional Development

10 Qs

BPI-Control Chart&PCI

BPI-Control Chart&PCI

Assessment

Quiz

Business

Professional Development

Hard

Created by

Lung-Sheng Chen

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In control charts, we use the sample mean plus or minus several standard deviations as control limits.
1
2
3
4

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In control charts, the boundary of 2 standard deviations (2σ) is commonly referred to as...?
Control limits
Modified control limits
Specification limits
Warning limits

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What type of variation requires changes to the system and management perspective?
Chance causes
Assignable causes
Special causes
Sporadic problems

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which control chart is used to detect changes in the mean values between groups?
R chart
X-bar chart
S chart
All of the above

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The purpose of SPC is...?
Identifying 'system errors'
Identifying 'localized errors'
Identifying variation
All of the above

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following process capability indices is incorrect?
Used to assess a process's ability to meet specifications
We typically need to first check if the data conforms to the assumption of normal distribution
Usually requires at least 30 data points
All of the above are correct

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following best expresses the usefulness of a correlation study in a process improvement project?
Eliminating sources of variation
Assessing the strength of the relationships between variables
Managing sources of variation
None of the above