Electrical Cables Quiz

Electrical Cables Quiz

12th Grade

30 Qs

quiz-placeholder

Similar activities

Electrical Engineering Quiz

Electrical Engineering Quiz

12th Grade

29 Qs

Electrical Systems Quiz

Electrical Systems Quiz

12th Grade

30 Qs

Electrical Wiring Test

Electrical Wiring Test

9th - 12th Grade

34 Qs

Generation, transmission and distribution of energy

Generation, transmission and distribution of energy

10th - 12th Grade

25 Qs

 NOCTI review

NOCTI review

11th - 12th Grade

35 Qs

AST Practice Exam #2

AST Practice Exam #2

11th - 12th Grade

30 Qs

Electrical Safety and Cable Knowledge Quiz

Electrical Safety and Cable Knowledge Quiz

12th Grade

30 Qs

NPG Unit 662 Power Distribution - Plant & Apparatus

NPG Unit 662 Power Distribution - Plant & Apparatus

12th Grade

26 Qs

Electrical Cables Quiz

Electrical Cables Quiz

Assessment

Quiz

Other

12th Grade

Easy

Created by

Yusuf Abubakar

Used 1+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Full form of PILCSTA on cables

Paper insulated lead covered steel wire armoured

Plastic insulated lead covered steel wire armoured

Paper insulated lead covered steel tape armoured

Paper insulated laminated copper steel tape armoured

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3c 300 SAC XLPE 11KV on a cable record means

3 core 300sqmm Copper unsheathed 11KV

3 x 1 core 300sqmm Aluminium lead sheathed 11 KV

3 Core 300sqmm Solid Aluminium Conductor 11KV

3Core 300sqmm Stranded Copper Conductor 11KV

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is a circuit main earth applied to an overhead line?

After the issue of a safety document

Before the issue of a safety document

Before the line is isolated

After the additional earths have been applied

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Electrolytic action takes place:

Where dissimilar metal conductors are used

A reaction inside an overhead line transformer

The amount of current a conductor can hold

A low resistance joint

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum open ground clearance for an LV overhead line?

6.4m

5.2m

2.8m

4.2m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are stockbridge dampers used on the overhead line steel towers?

To reduce damage due to lightening

To increase conductor strength

To increase insulator resistance

To reduce damage due to vibration

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When handling cold pour resins the mandatory PPE would be

Overalls and eye protection

Disposable gloves and breathing apparatus

Breathing apparatus and overall

Eye protection and disposable gloves.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?