Electrical Cables Quiz

Electrical Cables Quiz

12th Grade

•

30 Qs

quiz-placeholder

Similar activities

2017 POP CULTURE

2017 POP CULTURE

6th Grade - University

•

25 Qs

Enroute Flight

Enroute Flight

9th - 12th Grade

•

25 Qs

HCL-REVIEWER FOR MIDTERM

HCL-REVIEWER FOR MIDTERM

12th Grade

•

25 Qs

1.03 Recognizing and Responding to Emergencies

1.03 Recognizing and Responding to Emergencies

KG - Professional Development

•

25 Qs

Psychology - Motivation

Psychology - Motivation

9th - 12th Grade

•

25 Qs

Visual Media

Visual Media

12th Grade

•

25 Qs

Evolution of Media (Review)

Evolution of Media (Review)

12th Grade

•

26 Qs

Susulan/ Remidi IPS  kelas 8

Susulan/ Remidi IPS kelas 8

8th - 12th Grade

•

25 Qs

Electrical Cables Quiz

Electrical Cables Quiz

Assessment

Quiz

•

Other

•

12th Grade

•

Practice Problem

•

Easy

Created by

Yusuf Abubakar

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Full form of PILCSTA on cables

Paper insulated lead covered steel wire armoured

Plastic insulated lead covered steel wire armoured

Paper insulated lead covered steel tape armoured

Paper insulated laminated copper steel tape armoured

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3c 300 SAC XLPE 11KV on a cable record means

3 core 300sqmm Copper unsheathed 11KV

3 x 1 core 300sqmm Aluminium lead sheathed 11 KV

3 Core 300sqmm Solid Aluminium Conductor 11KV

3Core 300sqmm Stranded Copper Conductor 11KV

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is a circuit main earth applied to an overhead line?

After the issue of a safety document

Before the issue of a safety document

Before the line is isolated

After the additional earths have been applied

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Electrolytic action takes place:

Where dissimilar metal conductors are used

A reaction inside an overhead line transformer

The amount of current a conductor can hold

A low resistance joint

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum open ground clearance for an LV overhead line?

6.4m

5.2m

2.8m

4.2m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are stockbridge dampers used on the overhead line steel towers?

To reduce damage due to lightening

To increase conductor strength

To increase insulator resistance

To reduce damage due to vibration

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When handling cold pour resins the mandatory PPE would be

Overalls and eye protection

Disposable gloves and breathing apparatus

Breathing apparatus and overall

Eye protection and disposable gloves.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?