Marina Bay Sands Engineering Challenges

Marina Bay Sands Engineering Challenges

Assessment

Interactive Video

Created by

Olivia Brooks

Architecture, Design, Arts, Business

9th - 12th Grade

Hard

52:23

10 questions

Show all answers

1.

MULTIPLE CHOICE

30 sec • 1 pt

What is the primary challenge faced by engineers in constructing the Marina Bay Sands?

2.

MULTIPLE CHOICE

30 sec • 1 pt

What is the main issue with the reclaimed land on which Marina Bay Sands is built?

3.

MULTIPLE CHOICE

30 sec • 1 pt

What innovative solution was used to support the sloping hotel towers during construction?

4.

MULTIPLE CHOICE

30 sec • 1 pt

How did the 2008 financial crisis impact the Marina Bay Sands project?

5.

MULTIPLE CHOICE

30 sec • 1 pt

What was the solution to continue the Marina Bay Sands project during the financial crisis?

6.

MULTIPLE CHOICE

30 sec • 1 pt

What is the primary concern for the Sky Park in terms of structural stability?

7.

MULTIPLE CHOICE

30 sec • 1 pt

What technique was used to ensure the Sky Park could withstand wind forces?

8.

MULTIPLE CHOICE

30 sec • 1 pt

How was the Sky Park constructed to ensure precision and safety?

9.

MULTIPLE CHOICE

30 sec • 1 pt

What was the purpose of the movement joints in the Sky Park?

10.

MULTIPLE CHOICE

30 sec • 1 pt

What was the final test conducted to ensure the Sky Park's swimming pool was safe?

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Find a similar activity

Create activity tailored to your needs using

Quizizz AI
Adapting to Environmental Change: Managing Flood Risks and Coastal Erosion

6 questions

Adapting to Environmental Change: Managing Flood Risks and Coastal Erosion

interactive video

KG - University

Philip Hammond interview on Ebola efforts

6 questions

Philip Hammond interview on Ebola efforts

interactive video

9th - 11th Grade

Golden Gate Bridge Narrative Analysis

11 questions

Golden Gate Bridge Narrative Analysis

interactive video

4th - 8th Grade

Boris Johnson visits rail logistics hub

6 questions

Boris Johnson visits rail logistics hub

interactive video

9th - 12th Grade

Jeremy Corbyn visits Construction College

6 questions

Jeremy Corbyn visits Construction College

interactive video

University

Scores Drop Out of Singapore Airshow

6 questions

Scores Drop Out of Singapore Airshow

interactive video

University

TSX Movers: Athabasca, Pengrowth, Valeant

6 questions

TSX Movers: Athabasca, Pengrowth, Valeant

interactive video

University

QuickTake: Keystone XL Pipeline’s Second Chance

6 questions

QuickTake: Keystone XL Pipeline’s Second Chance

interactive video

University