Alcance API 570

Alcance API 570

University

17 Qs

quiz-placeholder

Similar activities

api 570 alcance

api 570 alcance

University

17 Qs

Solutions to Systems of Equations

Solutions to Systems of Equations

8th Grade - University

15 Qs

Linear Systems Different Methods

Linear Systems Different Methods

8th Grade - University

20 Qs

System of Equations with Inspection

System of Equations with Inspection

8th Grade - University

20 Qs

Systems of Equations One Solution No Solution or Infinite Solutions

Systems of Equations One Solution No Solution or Infinite Solutions

8th Grade - University

15 Qs

System of Equations Inspection

System of Equations Inspection

8th Grade - University

15 Qs

Systems by Graphing Inspection

Systems by Graphing Inspection

9th Grade - University

15 Qs

Systems Special Solutions by Inspection

Systems Special Solutions by Inspection

8th Grade - University

14 Qs

Alcance API 570

Alcance API 570

Assessment

Quiz

Mathematics

University

Hard

Created by

Ely Ramirez

Used 7+ times

FREE Resource

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

1. API 570 Code covers inspection, rating, repair, and alteration
A) metallic piping systems and their associated pressure-relieving devices (PRDs) that have been placed in-service
B) Metallic piping systems & associated pressure relieving devices already in service
C) Modifications or additions of new piping systems once placed into service
D) Pressure vessels, heaters, or heat exchanger internal or external piping

Answer explanation

A) metallic piping systems and their associated pressure-relieving devices (PRDs) that have been placed in-service

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

2. API 570 scope covers inspection, rating, repair, and alteration
A) In-service metallic and FRP piping systems
B) In-service metallic and non-metallic piping systems
C) In-service metallic and FRP piping systems and associated pressure relieving devices
D) metallic piping systems and their associated pressure-relieving devices (PRDs) that have been placed in-service

Answer explanation

D) metallic piping systems and their associated pressure-relieving devices (PRDs) that have been placed in-service

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

3. The intent of API 570 is
A) specify the in-service inspection and condition-monitoring program
B) Safety of operation
C) Operational reliability
D) Regulatory requirements are met

Answer explanation

A) specify the in-service inspection and condition-monitoring program

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

4. The intent of API 570 is
A) Extent of in-service inspection necessary to assure that all the regulatory requirements are met
B) In-service inspection and condition-monitoring program needed to determine piping integrity
C) Extent of in-service inspection necessary to assure operational reliability of piping systems
D) specify the in-service inspection and condition-monitoring program

Answer explanation

D) specify the in-service inspection and condition-monitoring program

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

5. The intent of API 570 is to specify the in-service inspection and condition-monitoring program:
A) to determine and maintain the ongoing integrity of piping systems
B) If Regulatory requeriments are met
D) Operational Reliability
D) Integrity of the piping system

Answer explanation

A) to determine and maintain the ongoing integrity of piping systems

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

6.  In-service inspection programs should provide reasonably accurate and timely assessments to determine if:
A)  any changes in the condition of piping could possibly compromise continued safe operation
B)   All of the in-service inspections have been completed to assure operational reliability
C)   All of the regulatory requirements within the jurisdiction have been met on time
D)   Any changes in condition of piping could possibly compromise piping integrity

Answer explanation

A)  any changes in the condition of piping could possibly compromise continued safe operation

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

7.  The intent of API 570 is that owner-users shall respond
A)   to any inspection results that require corrective actions to ensure that the continued integrity of piping is consistent with appropriate risk analysis
B)   That they do not affect the piping integrity
C)   Operational reliability of piping systems
D)   Continued safety of operation

Answer explanation

A)   to any inspection results that require corrective actions to ensure that the continued integrity of piping is consistent with appropriate risk analysis

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?