1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What should be issued when there is a question about information on plans? Pg 100

blueprints should be ordered
construction plans should be re-printed
a request for information (RFI) should be issued
a scale should be issued

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What would most likely be included on commercial plans but not on residential plans? Pg 102

MEP
drains
landscape
property lines

3.

MULTIPLE CHOICE QUESTION

30 sec • 6 pts

What is a legal right of way passage on a person's property? Pg 105

easement
property lines
front setback
monuments

4.

MULTIPLE CHOICE QUESTION

30 sec • 6 pts

Which plan shows landscaping, grading, sewer, and parking lots? Pg 105

electrical plan
site plan
floor plan
elevation plan

5.

MULTIPLE CHOICE QUESTION

30 sec • 6 pts

What is a reference point established by a licensed surveyor? Pg 106

not to scale (NTS)
finish floor elevation (FFE)
surveyor stakes
benchmark

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Outside or exterior, interior, and load bearing are all examples of what? pg107

walls

floors

ceilings

roofs

7.

MULTIPLE CHOICE QUESTION

30 sec • 6 pts

Which plan shows a bird's eye view including dimensions, types of materials, and location of windows? Pg 107

not to scale (NTS)
finish floor elevation (FFE)
foundation plan
floor plan

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?