On a large contract, a Clerk of Works is responsible for ensuring that: a) all safety procedures are observed in compliance with safety regulations b) the work is only carried out by competent craft operatives c) the work of the different crafts is properly co-ordinated d) the work is carried out to the specification laid down by the Architect.

Effective Working Relationships Quiz

Quiz
•
Construction
•
1st Grade
•
Hard

Andy Roper
Used 1+ times
FREE Resource
35 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
all safety procedures are observed in compliance with safety regulations
the work is only carried out by competent craft operatives
the work of the different crafts is properly co-ordinated
the work is carried out to the specification laid down by the Architect.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following is responsible for co-ordinating the work of the different crafts on a large contract?
Site manager.
Site supervisor.
Foreman bricklayer.
Clerk of Works.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The role of a Quantity Surveyor is to ______.
measure all the materials required for a job and order them
organise and recruit the labour required for the job to be undertaken
measure all materials used on an installation and prepare invoices
mark out the positions where pipework and appliances are to be installed.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
On a contract for the construction of a large office building with all mechanical services, alterations to the plumbing specification are required. These alterations would be ordered by the:
Water Inspector
Clerk of Works
Building Control Officer
Plumbing apprentice
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A customer requests information from a trainee that the trainee is unsure of. To develop a good working relationship with the customer it would be best to:
agree to ask someone else to help the customer and make a note so that this is not forgotten
advise that they are unsure, give the name of a person who could help and try to put the customer into contact with that person
explain that the detail drawings are in the site cabin, and point out the location of the site cabin
give the customer as much information as possible even if it is slightly incorrect.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following could ask a plumber in charge for a testimonial, stating that work has been carried out correctly?
Trainee plumber.
Private customer.
Building Control Officer.
General Foreman.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A customer wishes to know how much floor covering will be required for a bathroom in a house under construction. The most useful source of information to assist the customer would be the:
building plans
site plans
detailed installation instructions for sanitaryware
job specification for the installation location
Create a free account and access millions of resources
Similar Resources on Quizizz
Popular Resources on Quizizz
10 questions
Chains by Laurie Halse Anderson Chapters 1-3 Quiz

Quiz
•
6th Grade
20 questions
math review

Quiz
•
4th Grade
15 questions
Character Analysis

Quiz
•
4th Grade
12 questions
Multiplying Fractions

Quiz
•
6th Grade
30 questions
Biology Regents Review #1

Quiz
•
9th Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
50 questions
Biology Regents Review: Structure & Function

Quiz
•
9th - 12th Grade
Discover more resources for Construction
10 questions
Identifying equations

Quiz
•
KG - University
20 questions
r- controlled vowels review!

Quiz
•
1st - 2nd Grade
12 questions
Summer Trivia

Quiz
•
1st - 5th Grade
15 questions
Disney Trivia

Quiz
•
KG - 5th Grade
10 questions
Nouns, Verbs, and Adjectives

Quiz
•
1st - 2nd Grade
13 questions
addition and subtraction

Quiz
•
1st Grade
15 questions
First Grade Ready Math Unit 6 Review

Quiz
•
1st Grade
10 questions
Pixar Short "Piper"

Quiz
•
KG - 2nd Grade