Search Header Logo

Intro to BT Midterm

Construction

9th - 12th Grade

Used 17+ times

Intro to BT Midterm
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What are the vertical members in a wall frame called?

Studs

Headers

Plates

2.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What are the top and bottom members in a wall frame called?

Studs

Headers

Plates

3.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What is the common on-center for studs in a wall frame in a residential application?

24

18

16

4.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What type of nailer was used to construct your wall frames?

Framing

Brad

Hammer

5.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What type of saw was used in the construction of your wall frame?

Coping Saw

Circular Saw

Miter Saw

6.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What are the dimension of a construction grade 2x4?

1 1/2” x 3 1/2”

2” x 4”

1 1/4” x 3 1/4”

7.

MULTIPLE CHOICE QUESTION

30 sec • 4 pts

What type of wood was used in your squirrel picnic table?

Common Board

Pressure Treated

Standard Board

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?