PC10 Value Engineering Recap

PC10 Value Engineering Recap

Vocational training

12 Qs

quiz-placeholder

Similar activities

Con Built Environ PPT 7 Quiz

Con Built Environ PPT 7 Quiz

KG - University

15 Qs

Timber Defects in Construction

Timber Defects in Construction

KG - University

10 Qs

Sustainable Construction

Sustainable Construction

9th Grade

9 Qs

Understanding Sustainable Practices Quiz

Understanding Sustainable Practices Quiz

University

10 Qs

Quizziz #8 11/1/24 Foundations of Construction - PX Mr.Weber

Quizziz #8 11/1/24 Foundations of Construction - PX Mr.Weber

9th Grade

15 Qs

SCROLL SAW QUIZ

SCROLL SAW QUIZ

9th Grade

16 Qs

Introduction to Construction Technology and Structural Systems

Introduction to Construction Technology and Structural Systems

University

10 Qs

2.4 Customer Service and Company Policies Quiz

2.4 Customer Service and Company Policies Quiz

KG - University

14 Qs

PC10 Value Engineering Recap

PC10 Value Engineering Recap

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Tom Robinson

Used 1+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the primary objective of Value Engineering in construction?
Increase project complexity
Deliver necessary functions at the lowest cost
Extend project timelines
Increase material usage

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

During which phase of the Value Engineering process are alternative solutions generated?
Information Phase
Evaluation Phase
Creative Phase
Development Phase

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is NOT a key consideration in sustainable Value Engineering?
Recycled materials
Energy efficiency
Colour scheme
Waste minimisation

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which technology is highlighted for its role in detecting potential design issues in Value Engineering?

Virtual Reality (VR)

Building Information Modelling (BIM)

Geographic Information Systems (GIS)

Augmented Reality (AR)

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In the Curzon Street Station case study, the number of escalators was reduced from 44 to what number?
20
15
11
8

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is an example of a material substitution that could be identified through Value Engineering?
Using plastic instead of concrete
Substituting steel with engineered timber
Replacing glass with wood
Using aluminium instead of steel

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Off-site prefabrication is mentioned as a method to achieve what in Value Engineering?
Increase on-site labour
Reduce on-site labour and construction time
Increase material usage
Extend project timelines

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?