PC10 Value Engineering Recap
Quiz
•
Construction
•
Vocational training
•
Practice Problem
•
Medium
Tom Robinson
Used 1+ times
FREE Resource
Student preview

12 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the primary objective of Value Engineering in construction?
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
During which phase of the Value Engineering process are alternative solutions generated?
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is NOT a key consideration in sustainable Value Engineering?
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which technology is highlighted for its role in detecting potential design issues in Value Engineering?
Virtual Reality (VR)
Building Information Modelling (BIM)
Geographic Information Systems (GIS)
Augmented Reality (AR)
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
In the Curzon Street Station case study, the number of escalators was reduced from 44 to what number?
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is an example of a material substitution that could be identified through Value Engineering?
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Off-site prefabrication is mentioned as a method to achieve what in Value Engineering?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
20 questions
Figurative Language Review
Quiz
•
6th Grade