Housing Development Questions

Housing Development Questions

12th Grade

15 Qs

quiz-placeholder

Similar activities

Health and safety Noise quiz

Health and safety Noise quiz

12th Grade

13 Qs

Unit 122/124 Scratch/Floating Coats

Unit 122/124 Scratch/Floating Coats

12th Grade

20 Qs

Stairs Construction

Stairs Construction

9th - 12th Grade

14 Qs

Greywater & McHP

Greywater & McHP

2nd Grade - University

15 Qs

 Drainage - Pipe materials and falls

Drainage - Pipe materials and falls

11th Grade - University

10 Qs

M7: Review Questions (26307-20)

M7: Review Questions (26307-20)

12th Grade

15 Qs

Basic Hand Tools Quiz

Basic Hand Tools Quiz

9th - 12th Grade

10 Qs

Video: Instalación de cámaras de seguridad CCTV con NVR PoE

Video: Instalación de cámaras de seguridad CCTV con NVR PoE

11th Grade - University

11 Qs

Housing Development Questions

Housing Development Questions

Assessment

Quiz

Construction

12th Grade

Hard

Created by

Catherine Whiteman

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A housing association intends to build 150 houses on the site of a former school. The site is a brownfield site. Buildings were located on various parts of the site including classrooms, a sports hall and an administration block. Most of the site was playing fields, outdoor play areas or car parking. A decision has not been made on the form of construction contract that will be used. Which of the following are forms of construction contracts?

Design and Build

Traditional Contract

Management Contract

Cost Plus Contract

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A contractor has been appointed to refurbish a cinema that was originally built in the 1930s. To complete the work, the contractor has assembled a team that includes specialists in building services design. Explain one positive effect of teamwork on the progress of the refurbishment project.

Increased costs

Delayed timelines

Improved efficiency

Reduced quality

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The managers of a museum have appointed a construction company to design and construct a new building that will be used to house exhibitions. The project will follow the RIBA Digital Plan of Work. Which of the following are stages of a plan of work?

Design and construction

Marketing and sales

Recruitment and training

Maintenance and repair

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A college has commissioned a construction contractor to design and build a new workshop. What is one requirement specified by the college for the new building?

It must be built quickly.

It must be future proofed.

It must be cost-effective.

It must be environmentally friendly.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Figure 1 show in the document?

A floor plan

A cross section through the wall

A roof design

A landscape layout

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the height of the canopy in Figure 1?

3 metres

2.5 metres

4 metres

5 metres

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total height of the canopy from the base to the top in Figure 1?

5 metres

2.5 metres

3 metres

4 metres

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?