
24-25 SGM #1 - Engineering Design Parameters

Quiz
•
Engineering
•
11th Grade
•
Medium
Standards-aligned
Victor Salinas De Ases
Used 7+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
What is the primary purpose of determining design parameters in engineering design?
To ensure the design is aesthetically pleasing
To ensure the design is feasible and manufacturable
To reduce the cost of materials
To increase the complexity of the design
Tags
DOK Level 1: Recall
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which of the following is a design parameter that involves assessing the availability of skilled workers?
Materials
Personnel
Resources
Funding
Tags
DOK Level 1: Recall
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Identify a key factor that affects the manufacturability of a product.
The color of the product
The complexity of the design
The marketing strategy
The target audience
Tags
DOK Level 1: Recall
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which design parameter is directly related to the financial aspect of a project?
Time
Resources
Funding
Personnel
Tags
DOK Level 1: Recall
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Explain why time is considered a critical design parameter in engineering projects.
It determines the color scheme of the project.
It affects the project completion and delivery schedule.
It influences the choice of materials.
It impacts the number of personnel required.
Tags
DOK Level 2: Skill/Concept
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How does the choice of materials impact the feasibility of an engineering design?
It determines the project's aesthetic appeal.
It affects the durability and cost of the project.
It influences the number of personnel needed.
It impacts the project's marketing strategy.
Tags
DOK Level 2: Skill/Concept
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Describe a scenario where resource availability could limit the feasibility of an engineering project.
A project requires a rare material that is not readily available.
A project is completed ahead of schedule.
A project has an unlimited budget.
A project is designed for a small target audience.
Tags
DOK Level 2: Skill/Concept
Create a free account and access millions of resources
Similar Resources on Wayground
15 questions
Engineering Quiz

Quiz
•
11th Grade
20 questions
PLTW EOC Eng Ess Test Review 3

Quiz
•
9th - 12th Grade
15 questions
MESA Machine Contest Quiz

Quiz
•
7th Grade - University
21 questions
Fusion Vocabulary 2

Quiz
•
10th Grade - University
20 questions
1.4.1 - From High School to College: Guide for Future Engineers

Quiz
•
10th Grade - University
20 questions
PLTW Engineering Essentials

Quiz
•
11th Grade
20 questions
Chilean Bridge Design

Quiz
•
10th Grade - University
20 questions
Calgary's Shaganappi Bridge

Quiz
•
10th Grade - University
Popular Resources on Wayground
55 questions
CHS Student Handbook 25-26

Quiz
•
9th Grade
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
10 questions
Chaffey

Quiz
•
9th - 12th Grade
15 questions
PRIDE

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
22 questions
6-8 Digital Citizenship Review

Quiz
•
6th - 8th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
Discover more resources for Engineering
10 questions
Chaffey

Quiz
•
9th - 12th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Lab Safety and Lab Equipment

Quiz
•
9th - 12th Grade
20 questions
Getting to know YOU icebreaker activity!

Quiz
•
6th - 12th Grade
12 questions
Macromolecules

Lesson
•
9th - 12th Grade
12 questions
Classifying Polys - 1.1

Quiz
•
10th - 12th Grade
10 questions
Solving Equations Opener

Quiz
•
11th Grade