1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What is the primary purpose of determining design parameters in engineering design?

To ensure the design is aesthetically pleasing

To ensure the design is feasible and manufacturable

To reduce the cost of materials

To increase the complexity of the design

Tags

DOK Level 1: Recall

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which of the following is a design parameter that involves assessing the availability of skilled workers?

Materials

Personnel

Resources

Funding

Tags

DOK Level 1: Recall

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Identify a key factor that affects the manufacturability of a product.

The color of the product

The complexity of the design

The marketing strategy

The target audience

Tags

DOK Level 1: Recall

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which design parameter is directly related to the financial aspect of a project?

Time

Resources

Funding

Personnel

Tags

DOK Level 1: Recall

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Explain why time is considered a critical design parameter in engineering projects.

It determines the color scheme of the project.

It affects the project completion and delivery schedule.

It influences the choice of materials.

It impacts the number of personnel required.

Tags

DOK Level 2: Skill/Concept

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

How does the choice of materials impact the feasibility of an engineering design?

It determines the project's aesthetic appeal.

It affects the durability and cost of the project.

It influences the number of personnel needed.

It impacts the project's marketing strategy.

Tags

DOK Level 2: Skill/Concept

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Describe a scenario where resource availability could limit the feasibility of an engineering project.

A project requires a rare material that is not readily available.

A project is completed ahead of schedule.

A project has an unlimited budget.

A project is designed for a small target audience.

Tags

DOK Level 2: Skill/Concept

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?